Laserfiche WebLink
JLFH15-1995 0:12 FRCM I � <br /> TO 9G11820:3 P.02 <br /> 5bb �n 414_0 0 u <br /> / Table 1: Location and Frequency of Samples Q , * P o (2'- <br /> Sample Types and Frequency <br /> Location <br /> Coil— ~, Water <br /> Tank 1ta'end; middle QA (4) g/w 1 QA (Z) <br /> /Fuel Lines .%� J 1 per 20 ft N/A <br /> Stockpiles 1 per 35�cy"soil, 1 QA (4) - N/A <br /> TOTALS 11 Primary, 2 QA -1 primary, 1 QA <br /> Table 2fYAnalytes and Practical Quantitation Limits <br /> 0.- ga�2nllftlllnal Quantitation <br /> ANAL_ -T Limits <br /> Water . <br /> `Method 8020- <br /> Benzene 2 ppb <br /> Toluene 2 ppb <br /> Xylene Lib <br /> r Ethylbenzene 4 ppb <br /> EPA Method 7421-Lead m 1 PpbTPH- G, Purgeable 8015(5030) m 50 ppbTPH-D, Extractable 8015(3550) m 50 ppbThe lab must run a second column cn when running <br /> EPA Method-8020. <br /> 2.1.11 Close coordination shall be maintained with the USACE COR to ensure rapid <br /> resolution of problems and to achieve a satisfactory end product. The Contractor is <br /> cautioned to take no guidance during the course of the work under this DO from any <br /> sources other than the COR. The Contractor shall not proceed on any work outside of the <br /> originally negotiated DO unless authorized in writing by the Contracting Officer. <br /> 2.1.12 USACE Points of Contact: Questions relating to this DO shall be directed to the <br /> USACE COR. All deliverables required under this DO shall be submitted to the USACE <br /> COR. The USACE COR is Gary F. Gronemeyer, Area Engineer. <br /> DACA05-94-D-0012 D0#0012 March 9 1995 <br /> 4 ' <br /> TOTFL P.02 <br />