My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1998-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3775
>
2300 - Underground Storage Tank Program
>
PR0231418
>
COMPLIANCE INFO 1998-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:03 PM
Creation date
11/8/2018 9:55:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2006
RECORD_ID
PR0231418
PE
2361
FACILITY_ID
FA0003715
FACILITY_NAME
Tracy Blvd Chevron
STREET_NUMBER
3775
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
3775 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\TRACY\3775\PR0231418\COMPLIANCE INFO\COMPLIANCE INFO 1998-2006.PDF
QuestysFileName
COMPLIANCE INFO 1998-2006
QuestysRecordDate
5/25/2016 9:55:35 PM
QuestysRecordID
3092689
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
386
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mbrtitoring System Certification <br /> Site Address: 3775 TRACY BLVD Date of Testing/Service: 02/04/2004 <br /> F. in-Tank Gauging / SIR Equipment ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> Q Yes ❑No' Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Q Yes ❑No' Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑X Yes ❑No' Was accuracy of system product level readings tested? <br /> QYes ❑No' Was accuracy of system water level readings tested? <br /> M Yes ❑No' Were all probes reinstalled properly? <br /> ❑X Yes I ❑No' Were all items on the equipment manufacturers'maintenance checklist completed? <br /> 'In the Secfion H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD) : ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> M Yes ❑No' ❑N/A (Check all that apply)Simulated leak rate: Q 3 g.p.h ❑0.1 g.p.h 00.2 g.p.h <br /> FXJ Yes ❑No Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> FRI Yes ❑NO' Was the testing apparatus properly calibrated? <br /> ❑Yes ❑No' ❑X N/A For mechanical LLDs,does the LLD restrict product Flow if it detects a leak? <br /> Q Yes ❑No' ❑N/A For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> E Yes ❑No' ❑WA For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> M Yes ❑No' ❑N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a lest? <br /> M Yes ❑No' ❑N/A For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> rZI <br /> L'J Yes ❑No' Were all items on the equipment manufacturers'maintenance checklist completed? <br /> 'In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 Based on CA form dated 03101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.