My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1998-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3775
>
2300 - Underground Storage Tank Program
>
PR0231418
>
COMPLIANCE INFO 1998-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:03 PM
Creation date
11/8/2018 9:55:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2006
RECORD_ID
PR0231418
PE
2361
FACILITY_ID
FA0003715
FACILITY_NAME
Tracy Blvd Chevron
STREET_NUMBER
3775
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
3775 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\TRACY\3775\PR0231418\COMPLIANCE INFO\COMPLIANCE INFO 1998-2006.PDF
QuestysFileName
COMPLIANCE INFO 1998-2006
QuestysRecordDate
5/25/2016 9:55:35 PM
QuestysRecordID
3092689
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
386
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 ��// Page 2 <br /> 9. S*LL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes: ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested: El <br /> Test Method Developed By: Spill Bucket Manufacturer Industry Standard Professional Engineer <br /> Other(Specify) TECH <br /> Test Method Used: Pressure Vacuum ❑X Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# 91-FILL Spill Box# 89-FILL Spill Box# 87-FILL Spill Box# <br /> Bucket Diameter: 10x11 10X11 10x11 <br /> Bucket Depth: 12 12 12 <br /> Wait time between applying <br /> pressure/vacuum/water and 5MIN 5MIN 5MIN <br /> starting test: <br /> Test Start Time: 0900 0900 0900 <br /> Initial Reading(Rt ): 10 10 10 <br /> Test End Time: 1000 1000 1000 <br /> Final Reading(RF ): 5 10 10 <br /> Test Duration: 1HR 1HR 1HR <br /> Change in Reading(R F -Ri ) 5 0 0 <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Comments- (include information on repairs made prior to testing, and recommended follow-upfetrfailed tests) <br /> CHANGED OUT 91 FILL SPILL BKT. <br />
The URL can be used to link to this page
Your browser does not support the video tag.