Laserfiche WebLink
` iitoring System Certification <br /> Site Address: 3775 TRACY BLVD Date of Testing/Service: 09/17/2002 <br /> 0 1-205 <br /> D. Results of Testing/Servicing <br /> Software Version Installed: 16.04 _ <br /> Complete the following checklist: <br /> x Yes M No Is the audible alarm operational? <br /> Q Yes MNO' Is the visual alarm operational? <br /> Q Yes M No' Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not <br /> ❑ Yes ❑No' interfere with their proper operation? <br /> Yes No' NIA If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> ❑ Yes ❑No' ❑N/A monitoring system detects a leak,fails to operate,or is electrically disconnected?If yes:which sensors initiate positive <br /> shut-down?(check all that apply) ❑ Sumprrrench Sensors; ❑ Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ❑ yes No <br /> No' NIA For tank systems that utilize the monitoring system as the primary tank overfill warning device(Le.:no mechanical <br /> © Yes ❑ ❑ overfill prevention valve is installed),is the overfill warning alarm visible and audible at the tank fill points(s)and operating <br /> property? If so,at what percent of tank capacity does the alarm trigger? Bo / <br /> ❑ ves' ©No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> © <br /> Yes' No Was liquid found inside any secondary containment systems designed as dry systems?(check all that apply) ❑Product; <br /> Q Water. If yes,describe causes in Section E,below. <br /> ❑ <br /> Yes No' Was monitoring system set-up reviewed to ensure proper settings?Attach set-up reports,if applicable. <br /> ❑ <br /> Yes ©No Is all monitoring equipment operational per manufacturers'specifications? <br /> In Section E below,describe how and when these deficiences were or will be connected. <br /> E. Comments: <br /> ALL PLLD'S WOULD NOT TRIP AT A 3 GPH LEAK RATE BUT WOULD TRIP WITH A GROSS LEAK INTRODUCED. RAY VON <br /> FLUE ONSITE FROM SAN JOAQUIN COUNTY ENVIROMENTAL SERVICES. <br /> page 2 of 3 <br />