My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3775
>
2300 - Underground Storage Tank Program
>
PR0231418
>
COMPLIANCE INFO_2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 4:26:02 PM
Creation date
11/8/2018 9:55:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2017
RECORD_ID
PR0231418
PE
2361
FACILITY_ID
FA0003715
FACILITY_NAME
Tracy Blvd Chevron
STREET_NUMBER
3775
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
3775 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\TRACY\3775\PR0231418\COMPLIANCE INFO\COMPLIANCE INFO 2017 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2017 - PRESENT
QuestysRecordDate
6/12/2017 11:15:57 PM
QuestysRecordID
3428349
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHAUN AAQU I N Environ -mAal Health Department <br /> Linda Turkatte, REHS, Director <br /> —COUNTY— Kasey Foley,REHS,Assistant Director <br /> Greatness grows here. PROGRAM COORDINATORS <br /> Robert McClellon,RENS <br /> Jeff Carruesco,REHS,RDI <br /> Rodney Estrada,REHS <br /> Willy Ng.REHS <br /> Munlappa Naldu,RENS <br /> Apri124,2017 <br /> MARKVENDEIRO COPY MVP PETROLEUM ENGINEERING INC. �--' u <br /> P.O. BOX 281 <br /> FOLSOM, CA 95763 <br /> Re: TRACY BLVD CHEVRON SR0076811 <br /> 3775 N TRACY BLVD <br /> TRACY, CA 95376 <br /> The San Joaquin County Environmental Health Department (EHD) has completed the review of the <br /> application for a permit to (1) replace the existing dispensers with Wayne Ovation dispensers, (2) install <br /> Bravo Conv-82000 conversion frames, (3) change the exiting 89-octane UST to diesel UST, flush the 89- <br /> octane piping back into the tank using water, disconnect the 89-octane vapor recovery piping at the <br /> converted tank, cap both ends of the vapor recovery pipe with 2-inch steel caps, disconnect the converted <br /> diesel tank vent from the vent manifold and install a rain cap on the diesel vent, (4) install new ISD <br /> boards/software and cold start the monitoring system on the underground storage tank(UST)system at the <br /> above noted address. The permit has been approved with the following conditions: <br /> 1. Contact the local fire department and the San Joaquin Valley Air Pollution Control District for any <br /> applicable permits and requirements. <br /> 2. Any changes in information and scope of work must be submitted to EHD for approval prior to <br /> commencing work. All new addenda supersede the previous ones. <br /> 3. Contact Stacy Rivera at(209)468-3440 to arrange the fallowing appointments(a 48-hour notice is <br /> required for inspection appointments). <br /> a. Sensor functionality:Functionality of the monitoring system must be verified to ensure that <br /> monitoring has been restored to meet the requirements of Title 23 California Code of Regulations <br /> and the Health&Safety Code. A copy of the alarm history shall be printed prior to performing <br /> the"cold start'of the monitoring system and made available at the time of EHD inspection. <br /> b. Leak detector test: Electronic line leak detectors must be tested to confirm that the device can <br /> detect a leak of 3 gallons per hour at 10 psi. <br /> c. Verification of the dispenser footprints contained by the under dispenser containment sumps <br /> (UDCs). <br /> d. Visual Inspection of the piping within the dispensers for any leaks. <br /> e. 24-hour hydrostatic test(or equivalent)on all impacted sumps(where piping was terminated) <br /> f. Provide hazardous waste determination and proof of proper disposal for the generated 89-octane <br /> tank/piping rinsate. <br /> Please be aware that the facility cannot operate the UST system prior to the EHD inspection <br /> and approval. <br /> 4. Secondary containment testing for the impacted sumps(where piping was terminated)is required six <br /> months after installation. Provide 48 hours notification to the EHD when this test is scheduled. <br /> 5. If concrete will be broken near any tank,a secondary containment test must be performed on the <br /> impacted tank once concrete is poured in accordance with the manufacturer's guidelines. <br />
The URL can be used to link to this page
Your browser does not support the video tag.