My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3775
>
2300 - Underground Storage Tank Program
>
PR0231418
>
COMPLIANCE INFO_2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 4:26:02 PM
Creation date
11/8/2018 9:55:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2017
RECORD_ID
PR0231418
PE
2361
FACILITY_ID
FA0003715
FACILITY_NAME
Tracy Blvd Chevron
STREET_NUMBER
3775
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
3775 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\TRACY\3775\PR0231418\COMPLIANCE INFO\COMPLIANCE INFO 2017 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2017 - PRESENT
QuestysRecordDate
6/12/2017 11:15:57 PM
QuestysRecordID
3428349
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'�WD-70711 <br /> MVP PETRO- EUM ENGINEERING ' C.A CALIFORNIA CORPORATION <br /> mvpeng@aft.net- PO Box 281 Folsom, CA 95763-0281• Phone(916)984-1537• Fax(916)984-1117•Cellular(916)205-1537 CA#768938 <br /> March 27, 2017 <br /> Elena K. Manzo <br /> San Joaquin County <br /> Environmental Health Department <br /> Re: Chevron 3775 N Tracy Blvd <br /> Elena, <br /> Per page 2 of the recently submitted UST System Retrofit or Rep r application the following refers to lines 3 <br /> and 4: <br /> Line 3: <br /> We propose to: <br /> Replace the existing dispensers with Wayne Ovations <br /> Change the 89 gasoline tank to Diesel <br /> Disconnect the vapor recovery piping at the converte diesel tank in the sump. Cap / plug vapor line <br /> Disconnect the converted diesel tank vent from the ent manifold and install a rain cap on the diesel vent <br /> Change the existing ISD to Veeder Root— cold st Veeder Root after installing new ISD boards and <br /> software <br /> Line 4: (parts list) <br /> Six Wayne Ovation dispensers —four B12 3+0) and two B23 (3+1) <br /> Veeder Root balance vapor meters <br /> Veeder Root ISD upgrade boards and s ftware <br /> Bravo conversion frames <br /> Thank you, RU <br /> � ���� <br /> Mark Vendeiro D a <br /> MVP Petroleum Engineering nc. MAR 2 9 Z017 <br /> ENVIRONMENTAL ALTH <br /> DEPARTMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.