Laserfiche WebLink
SWRCB,January 2002 Page 7 or 7 <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes 13 <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> Test Method Developed By: ❑Spill Bucket Manufacturer 0 Industry Standard 13 Professional Engineer <br /> 13 Other(Spech) <br /> Test Method Uses: ❑Pressure 0 vacuum ®Hydrostatic <br /> 0 Other(Specify) <br /> Test ui cnt Used:INCON TS-ST'S E ui alt Resolution: 0.OiII" <br /> Spill Boz# 1 Spill Bol it Spill Box 4 Spill Box 4 <br /> Bucket Diameter: 12" <br /> Bucket Depth: 12" <br /> Wait time between applying <br /> pressure/vacuurn/water and 30 MIN. <br /> starting test: <br /> Test Start Time: 11:35 ANIUI1:52 AM <br /> Initial Reading(Rt): 4.9902"14.9898" <br /> Teat End Time: 11:50 AM/I 2:07 PM <br /> Final Reading(RF): 4.9899"14.9900" <br /> Test Duration: 2X15 MIN. <br /> Change in Reading(RF-Rt): +0.0002" <br /> Pass/Fail Threshold or Criteria: 0.002" <br /> Teat Rewlt: PASS <br /> Comments-(include information on repairs made prior to testing. and recommendedfollow-up for failed tests) <br /> Please direct any comments regarding this form to: <br /> SWRCB UST Program,Attn:Scott Bacon <br /> 1001 "I"Street.Box 944212 <br /> Sacramento,CA 95814 <br /> Phone:(916)341-5873,Fax:(916)341-5808 <br /> e-mail:bacons(acwp.swrcb.ca.gov <br /> Revision: <br />