Laserfiche WebLink
I <br /> Monitoring System Certification <br /> [1ST Monitoring Site Plata <br /> Site Address: 2500 W0.%I.1«rner[cd <br /> ` - - - - - - • - - - - - - - - - - - - - - - - - - - - -- <br /> - - - - - - - - <br /> • - - - J - <br /> -- - /Q - - - - . . . - - - - - - - - - - - - - - - - - - - - - - - <br /> . . . . . . . &. <br /> - A - - - <br /> , 4a�- . . .- - - - . - . . - - - - - - - <br /> - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - qT <br /> - - - - - - 'r/P ynae - - - - - - - - - - - - - - - - - - - - - - - <br /> - : : : : : - : X - - - - - - - - : - - - - - - - - - : - : : <br /> Date map was drawn: S 1 /�Z <br /> Instructions <br /> if you already have a diagram that shows all required information,you may include it,rather than this page,with <br /> vour Monitoring System Certification. On your site plan, show the general layout of tanks and piping. Clearly <br /> identify locations of the following equipment, if installed: monitoring system control panels; sensors <br /> monitoring tank annular spaces. sumps,dispenser pans, spill containers.or other secondary containment areas', <br /> mechanical or electronic line leak detectors; and in-tank liquid level probes (if used for leak detection). In the <br /> space provided, note the date this Site Plan was prepared. <br />