My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2500
>
2300 - Underground Storage Tank Program
>
PR0232507
>
COMPLIANCE INFO 2007 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 12:00:24 PM
Creation date
11/8/2018 9:56:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007 - 2015
RECORD_ID
PR0232507
PE
2361
FACILITY_ID
FA0003846
FACILITY_NAME
Verizon Business: LDIKCA
STREET_NUMBER
2500
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
029-030-39
CURRENT_STATUS
01
SITE_LOCATION
2500 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\TURNER\2500\PR0232507\COMPLIANCE INFO 2007 - 2015.pdf
QuestysFileName
COMPLIANCE INFO 2007 - 2015
QuestysRecordDate
9/9/2016 5:33:19 PM
QuestysRecordID
3186119
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monjtoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address: 2500 West Turner Rd. <br /> - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - <br /> Date map was drawn: 4 / 25 / 12 <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include it, rather than this page, with <br /> your Monitoring System Certification. On your site plan, show the general layout of tanks and piping. Clearly <br /> identify locations of the following equipment, if installed: monitoring system control panels; sensors <br /> monitoring tank annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; <br /> mechanical or electronic line leak detectors; and in-tank liquid level probes (if used for leak detection). In the <br /> space provided, note the date this Site Plan was prepared. <br />
The URL can be used to link to this page
Your browser does not support the video tag.