My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2500
>
2300 - Underground Storage Tank Program
>
PR0232507
>
COMPLIANCE INFO 2007 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 12:00:24 PM
Creation date
11/8/2018 9:56:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007 - 2015
RECORD_ID
PR0232507
PE
2361
FACILITY_ID
FA0003846
FACILITY_NAME
Verizon Business: LDIKCA
STREET_NUMBER
2500
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
029-030-39
CURRENT_STATUS
01
SITE_LOCATION
2500 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\TURNER\2500\PR0232507\COMPLIANCE INFO 2007 - 2015.pdf
QuestysFileName
COMPLIANCE INFO 2007 - 2015
QuestysRecordDate
9/9/2016 5:33:19 PM
QuestysRecordID
3186119
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
140224-441 <br /> D. Results of Testing/Servicing <br /> Software Version Installed: VA <br /> Complete the following checklist: <br /> x Yes Q No' I Is the audible alar operational? <br /> iii Yes — No' Is the visual alarm operational? <br /> fi Yes No. Were all sensors vLsually inspected,functionally tested,and confirmed operational? <br /> se Yes No" Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br /> roper operation? <br /> x Yes No" if alarms are relayed to a remoto monitoring station,is all communications equipment(e.g.modem)operational? <br /> NIA <br /> Yes [ No` For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system <br /> x N/A detects a leak,fails to operate,or is electrically disconnected? If yes:which sensors initiate positive shut-down? (Check all that apply) <br /> SumplTrench Sensors; 0ispenser Containment Sensors. Did you confirm positive shut-down due to leaks and sensor <br /> failure/disconnection? ..E Yes, No. <br /> K Yes No' For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e. no mechanical overfill prevention <br /> NIA valve is installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating property? If so,at what percent <br /> of tank capacity does the alarm trir? 9fi°A <br /> Yes' x No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> To Yes' No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply)[]Product; C3 Water. If <br /> s,describe causes in Section E,below. <br /> M Yes No` Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> A Yes I Ll No' Is all monitoring equipment operational per manufacturer's specification? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Found a small amount of clean rainwater in the south turbine sum . It was <br /> removed and placed with the spill bucket test water. <br /> Monitoring System Certification Page 2 of 4 12107 <br /> 2 2121107 <br />
The URL can be used to link to this page
Your browser does not support the video tag.