Laserfiche WebLink
W. TURNER ROAD <br /> s <br /> fit 'aME, �^ W <br /> f <br /> ss � - <br /> a� % _ tme <br /> 0'= <br /> EXISTING sem§ <br /> LANDSCAPE EXISTING <br /> LANDSCAPE <br /> 8 At <br /> VICINITY MAP <br /> EXISTING 0 KEYED NOTES: <br /> EXISTING LANDSCAPE 1O 4,000 GALLON OWENS-CORNING DOUBLE-WALL TANK. o <br /> BUILDING PARKING O O2 PNEUMERCATOR TMS-2000 TANK MONITOR SYSTEM. z <br /> U8 <br /> O TOTAL CONTAINMENT NLPRIMARY & SECONDARY aLL <br /> W 3 SUPPLY & RETURN PIPIPING.. BLACK IRON PRIMARY & FIBERGLASS 3 n <br /> SECONDARY VENT PIPING. g W, <br /> AREA OF 0 Q ® REINFORCED CONCRETE TANK SLAB. Q$ 01 <br /> WORK $� EMERGENCY GENERATOR. 4 <br /> 3 EXISTING io <br /> 2 BUILDING EXISTING Ln © EXISTING OVERFILL ALARM AND ACKNOWLEDGEMENT SWITCH e <br /> 4 / k <br /> e � PARKING LANDSCAPE � a <br /> w <br /> EXISTING EXISTING 3 <br /> LANDSCAPE LANDSCAPE O SCOPE OF WORK <br /> J � a <br /> LOCK OUT/fAG THE POWER TO THE EXISTING TURBINES. y .� <br /> }� }4 z REMOVE THE EXISTING TURBINE RELAYS. <br /> INSTALL TWO NEW FRANKUN FUELLING SMART TURBINE CONTROLLERS. <br /> PARKING <br /> INSTALL NEW INCON STAND-ALONE ELECTRONIC LINE LEAK MONITORING PANEL <br /> WITH PRINTER, MODEM AND ELLD SOFTWARE. <br /> O <br /> INSTALL NEW REMOTE HARM WITH ACKNOWLEDGEMENT SWITCH. � N fj <br /> i <br /> INSTALL ONE INCON EXPLOSION PROOF ELECTRONIC LINE LEAK DETECTOR (ELLD) d ^� <br /> SITE PLAN SCALE: FOR EACH TURBINE. 'J a <br /> o zo 40 t" = 20,-0.. MODIFY THE CONDUIT TO <br /> POWER CONDUCTORS, AND DAITA JUNCTION BOX, PULL TURBINE <br /> CAM FOR THE ELLD8 <br /> COMMISSION THE NEW ELLD SYSTEM FOR PROPER OPERATION AND CERTIFICATION. <br /> MATERIALS \ <br /> D PERFORM FINAL INSPECTION WITH SAN JOAUIN COUNTY HEALTH DEPARTMENT \/\\� <br /> O INCON EVO MONITORING B CUPA. > <br /> SYSTEM, DISPLAY, PRINTER, <br /> MODEM. FRANKLIN FUELING <br /> T550EDPM <br /> O ELECTRONIC LINE LEAK . <br /> DETECTION 1-PRODUCT LINE y1 <br /> EXPLOSION PROOF TRANSDUCER I .I. E <br /> KIT. FRANKLIN F LING . .. I <br /> 7 - DO / Tlt+ A O <br /> (D SUBMERSIBLE TURBINE 4 D <br /> PUMP-SCI SINGLE PHASE yt�+ 2 - -A3 tp <br /> SMART CONTROLLER, INCON � � Yt <br /> STP I L�I�4 Y <br /> O LOGIC PANEL. ERACTKLIN `1 <br /> FUELING I$ 'ON & TS-ELLD/G ' lj+ <br /> C <br /> / NOV 6 2018 <br /> O OVERFILL ALARM AND + . . . B <br /> G <br /> ACKNOWLEDGEMENT SWITCH. . . . . . v TI I+ [�L <br /> INCON TS-RAI & TS-RK <br /> ,ANNULAR <br /> OB.BTURBINE SATE.• <br /> .• - -J+) . ENVIRpEP R�MEtaaT ¢¢ a ppqq w <br /> O .SPILL BUCKET <br /> s RSINE' tl i Q <br /> NOTE: <br /> r � J � 3 ssNrl <br /> NOT ALL OF THE EXISTING PIPE AND L--- --A <br /> FITTINGS WITHIN THE SUMPS ARE 4 . . + <br /> SHOWN IN THESE NEWS FOR CLARITY. . . SWC 09-00-2 0-2 1 0 <br /> °"' 018 <br /> SCALE: <br /> TURBINE SUMP DETAIL NTS LE 3 AREA OF WORK t" = 5'-0" 2 a ¢ <br />