My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2500
>
2300 - Underground Storage Tank Program
>
PR0232507
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 12:45:31 PM
Creation date
11/8/2018 9:57:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0232507
PE
2361
FACILITY_ID
FA0003846
FACILITY_NAME
Verizon Business: LDIKCA
STREET_NUMBER
2500
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
029-030-39
CURRENT_STATUS
01
SITE_LOCATION
2500 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\TURNER\2500\PR0232507\COMPLIANCE INFO 2016 - PRESENT .PDF
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
9/9/2016 6:45:56 PM
QuestysRecordID
3187990
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� t <br /> RECEWED <br /> QEF 05 2018 <br /> 4. TANK ANNULAR TESTING ENVIRONMENTAL <br /> Test Method Developed By: ❑Tank Manufatcturer ©Industry Standard ❑Professi , _ 77,77 T <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure [Z]Vacuum ❑Hydrostatic <br /> ❑01 1,Cr(.S j)e0fo <br /> Test Fquipm w I_sM 0 TO 30" HG. GLYCERIN FILLED VACULM GUAGE I cImpn ow Rosottmon 0.1"HG. <br /> Tank# 1 'Lank 9 '1 ank 4 Tank u <br /> Is Tank Excmpt From Testing'" [])'es ONo ❑)-C> []NO ❑S'cs ❑\o []Yes No <br /> Tank Capacity: 4,000 GAL. <br /> Tank Material: FIBERGLASS <br /> Tank Manufacturer: OWENS CORNING <br /> Product Stored: DIESEL <br /> Wait time between applying <br /> pressurcwacutim/watcr and 15 MIN. <br /> start in g test: <br /> Test Start Time: 10:05 AM <br /> Initial Reading(R,): 10" HG. <br /> Test End Time: 11:05 AM <br /> Final Reading(R}): 10" HG. <br /> Test Duration: 1 HOUR <br /> Change in Reading(Rf-R,): 0 <br /> Pass/Fail Threshold or Criteria: 0.000 <br /> Test Result: 0 Pans ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail ❑ Pass ❑Fail <br /> N as sensor removed for testing? ❑�Yes []No []NA ❑Yes []No []NA ❑Yes[:]No [3NA ❑Y'es []No [-]NA <br /> Was sensor properly replaced and ❑Y, ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> verified functional after test ing? es No NA Yes Na ti:5 Yes \o \:1 l'es No \:\ <br /> Comments—(include infr nnation on repairs made prior to lesling,and reconunended folloua-rip forfailtiIlec►s) <br /> Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment <br /> testing. ;California Code of Regulations.Title 23,Section 2637(a)(6); <br />
The URL can be used to link to this page
Your browser does not support the video tag.