My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1986
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VAL DERVIN
>
123
>
2300 - Underground Storage Tank Program
>
PR0231272
>
INSTALL_1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2024 2:30:03 PM
Creation date
11/8/2018 9:57:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1986
RECORD_ID
PR0231272
PE
2361
FACILITY_ID
FA0003558
STREET_NUMBER
123
STREET_NAME
VAL DERVIN
STREET_TYPE
PKWY
City
STOCKTON
Zip
95231
CURRENT_STATUS
02
SITE_LOCATION
123 VAL DERVIN PKWY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\V\VAL DERVIN\123\PR0231272\INSTALL 1986 .PDF
QuestysFileName
INSTALL 1986
QuestysRecordDate
8/16/2017 4:05:07 PM
QuestysRecordID
3583718
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Electronic Control Panel <br /> Models S130011 and SB0014 <br /> For Owens-Corning Double-Wall Tanks <br /> with Liquid Head Pressure Monitor <br /> 1 .1 General Description 1.4 Installation <br /> An optional electronic control panel for continuous monitoring Installation of Model SB0011 is detailed in this section.Reference <br /> and instant alarm is available in a number of configurations.The Fig.B for Model SB0014 circuit diagram.The control panel is <br /> liquid sensing probe assembly is included with the reservoir(con- packaged preassembled and ready to wire.Locate the control <br /> tractor provides the wiring from the probe assembly to the control <br /> panel).The electronic control panel senses the presence of the Panel in anon-hazardousarea whereon explosive environment <br /> does not exist. <br /> liquid in the reservoir by measuring the conductance between the <br /> two stainless steel probes on the probe assembly.The control The control panel can be wall mounted using the provided <br /> panel is complete with warning bell,panel lights and transmission mounting hardware. <br /> contacts for other optional warning devices(contractor provided) power Circuit <br /> such as a telephone dialer,a light beacon,etc. <br /> A 120 volt AC power source is required.All wiring must be in <br /> accordance with local codes.The power circuit wiring(contractor <br /> 1.2 Features provided)enters the left conduit at the bottom of the control panel <br /> and is connected to terminals 1 and 2. <br /> Model SB011 ModeISB0011 <br /> Shown Alarm Test Shown <br /> ' <br /> 'Button o e o) <br /> -- -Alarm Light <br /> Normal Light o e !v) <br /> Bell Silence Light <br /> Alarm Bell Silence Switch Ll U <br /> Bell <br /> Padlock <br /> Hasp Power Circuit <br /> Model S800 11 NE MA 4X sa single (To 120 Volts AC) <br /> ( N o circuit conlronresewhir(See"Sight monitor <br /> One torah nragmup of tanks manl101tletl loo common reservoir(See"Sight Glass" ' <br /> manifold piping conliguratlon) <br /> A circuit breaker(contractor provided)common to other devices <br /> is recommended.Using a circuit breaker common to other <br /> Mode I SB0014 devices will Increase the probability the tank owner is aware of a <br /> Shown /- Alarm Test tripped circuit breaker.If there is no power to the control panel, <br /> Bunions(4) <br /> -�\� /; GI✓ the alarm bell and other warning devices cannot be activated. <br /> Alarm <br /> Lights Probe Circuit <br /> A preassembled reservoir probe(mounted in the reservoir)is <br /> a Bell d reao wire(contractorsu lied oeconro <br /> Silence y ti <br /> PP )lthtlForintrin- <br /> panel. <br /> Alarm Bell switch sically safe wiring,use 16 AWG type MTW or 14AWG type TH NN <br /> Bee silence (contractor supplied).For UL rated applications the maximum <br /> Light wiring distance between the probe and control panel is 1,750 feet. <br /> Normal The wiring for the probe circuit enters the right conduit at the <br /> Lights <br /> Padlock Hasp bottom of the control panel and is connected to terminals A and B. <br /> Model S80014(NE MA 4X)is a tour circuit control panel used to individually monitor Model SB0011 <br /> Lill to lam msrrvnus ($ru,ndepnndoni mortaring piping conhguranon) Shown I <br /> M+1 <br /> I <br /> SANFORD-ALESSI A SO S, N <br /> 1 .3 Specifications (Model S13001 _Mechanical E gin g T <br /> , � p <br /> and SB0014) @@ N i Exceptions Taken <br /> he Corrections Noted ` <br /> Control Panel: Irce, <br /> is eview is only for genera con - rca <br /> 4 No.of monitoring circuits: 1 (SB0011);4(S130014)•Power h he contract documents and d nc'. <br /> Source: 120 volts AC•Intrinsically safe circuil for probe assembly iellthe contractor of his respon bilay <br /> •Electrical components rating:ULlisted(weatherproof,NEMA ompIy� Daher uitemenits of the Probe Circuit <br /> 4X)•Control panel dimensions: 10"H x 14"W x 8"D(SB0011) atr kniggty°ltj � '- ane (To Probe Assembly) <br /> 20"H x 17"W x 10"D(SB0014)•Panel housing material la' <br /> fiberglass•Panel lights for each circuit(normal and alarm)•Two <br /> spare light bulbs•Alarm test button for each circuit•Warning bell <br /> •Alarm bell silence switch and light•Hasp for padlock•Trans- <br /> mission contacts(normally closed)for phone dialer(not provided) <br /> by Owens-Corning)•Wall mounting hardware•Weight:10 <br /> Pounds(SB0011);25 pounds(S80014) <br />
The URL can be used to link to this page
Your browser does not support the video tag.