My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
550
>
2300 - Underground Storage Tank Program
>
PR0536555
>
INSTALL_2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2019 3:22:40 PM
Creation date
11/8/2018 9:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2012
RECORD_ID
PR0536555
PE
2351
FACILITY_ID
FA0020989
FACILITY_NAME
Arco. Am pm 83333
STREET_NUMBER
550
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
Rd
City
Tracy
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
550 W Valpico Rd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\V\VALPICO\550\PR0536555\INSTALL PLAN 2012.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. REQUIRED SUBMITTALS _ <br /> The following information shall be submitted to San Joaquin County Environmental Health <br /> Department prior to an installation plan review: <br /> 1. TO BE SUBMITTED WITH APPLICATION: <br /> x❑ San Joaquin County EHD Service Request Form and Fee Sheet <br /> x❑ Completed Underground Storage Tank System Installation Permit application <br /> ❑X Completed: UPCF Underground Storage Tanks - Facility form (A); UPCF <br /> Underground Storage Tanks (B)-Tank (one form per tank) <br /> FX1 Manufacturers' cut sheets for tanks, piping, and equipment (e.g. monitoring <br /> equipment, overspill containment device, overfill protection device, dispenser <br /> pan, etc.) <br /> FX1 Buoyancy calculations signed by a Professional Engineer <br /> 7 3-sets of plans of the facility and underground storage tank system along with <br /> specifications on all materials to be used in construction <br /> Payment of appropriate permit fees <br /> DRAWINGS SHALL INCLUDE THE FOLLOWING: <br /> M Plans must be drawn to scale in non-erasable ink <br /> P Tank cross-sectional drawing <br /> 0 Detail of tank, associated piping, excavation and cover <br /> FX] Plot plan to show location of tanks and all associated piping <br /> FX] Striker plates or drop tube-mounted bottom protectors illustrated below all <br /> accessible openings <br /> Under-dispenser containment connections <br /> F Detail of secondary containment installed for all unused tank opening that are <br /> connected to the primary space of the UST <br /> 0 Detail of sumps and under-dispenser containment to demonstrate vapor tightness <br /> 0 Detail of system that demonstrates it is impervious to water intrusion. <br /> 0 Overfill prevention system <br /> 0 Location of all monitoring equipment <br /> 0 Location of water wells, septic systems, and storm drains. <br /> Note: Enhanced Leak Detection (ELD) must be performed prior to the final inspection. <br /> A separate permit application is required to install ELD. <br /> Revised 07/22/10 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.