My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
550
>
2300 - Underground Storage Tank Program
>
PR0536555
>
INSTALL_2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2019 3:22:40 PM
Creation date
11/8/2018 9:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2012
RECORD_ID
PR0536555
PE
2351
FACILITY_ID
FA0020989
FACILITY_NAME
Arco. Am pm 83333
STREET_NUMBER
550
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
Rd
City
Tracy
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
550 W Valpico Rd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\V\VALPICO\550\PR0536555\INSTALL PLAN 2012.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 6 <br /> Thuy Tran [EH] <br /> From: Jeff Weddle [jweddle@barghausen.com] <br /> Sent: Thursday, December 08, 2011 9:24 AM <br /> To: Thuy Tran [EH] <br /> Cc: File;Amber Kelly; Robert.Huff@ci.tracy.ca.us; Dan Goalwin; Sean Murphy; Omar Vasquez <br /> Subject: RE: Arco am/pm Fuel Facility; Valpico Road &Tracy Blvd, Tracy, CA(BCE#14624) <br /> Attachments: 14624 2011-12-08 Revised Fuel Set.pdf <br /> Thuy, <br /> I have revised item 183 and have attached the entire plan set as per your request. Comment noted regarding <br /> the revised documents prior to completion of installation. Please give me a call if you have any questions. <br /> Thank you, <br /> Jeff Weddle I Senior Cadd Technician <br /> Barghausen Consulting Engineers, Inc. <br /> 18215 72nd Avenue South I Kent, WA 98032 <br /> D 425.656.7493 1 F 425.251.8782 1 M 425.251.6222 <br /> www.barghausen.com I iweddte@barghausen.com <br /> Please consider the environment before printing this email. <br /> From: Thuy Tran [EH] [mailto:tttran@sjcehd.com] <br /> Sent: Monday, December 05, 20118:55 AM <br /> To: Omar Vasquez <br /> Cc: Jeff Weddle; File; Amber Kelly; Robert.H uff@ci.tracy.ca.us; Dan Goalwin; Sean Murphy <br /> Subject: RE: Arco am/pm Fuel Facility; Valpico Road &Tracy Blvd, Tracy, CA (BCE #14624) <br /> Omar, <br /> Please revise sheet M.5.3.02. Item 183. states that fill galvanized risers will be used. Missed that on the first <br /> round.Your answer was that gasoline and diesel would be utilizing black iron pipe risers. Please revise. <br /> Also would you be able to submit me the entire PDF plan sheet via email? Should be able to get the approval <br /> letter to you this evening once I have the entire PDF plan sheets. Greatly appreciate it. <br /> Jeff, <br /> The following documents needs to be revised but will not hold up the approval letter. It does need to be corrected <br /> in order to grant permission to operate the facility upon completion of the installation. <br /> Would you be able to revise the following documents on the Unified Program Consolidation Forms: <br /> 1. Facility information: Property Owner information states the land is owned by Pacific West Petroleum of Concord <br /> but the assessor's office states it belongs to South Tracy Land Partners LLC. <br /> 2. Monitoring Plan: Section IV Part 1. Continuous Electronic Monitoring for annular space should be liquid filled, <br /> not pressurized. Sensor should be VR 794380-303 <br /> 3. Monitoring Plan: Section V Part I. Continuous Monitoring of pipes should be dry, not pressurized <br /> 4. Monitoring Plan: Section VII Part 3. check that Spill buckets are tested annually <br /> 5. Monitoring Plan: Section X. Comments: please state that"Overfill prevention is set at 90% of tank capacity with <br /> audible&visual alarm" <br /> 6. Monitoring Plan: Section XI. Please list personnel responsibilities. <br /> 7. Response Plan: Section IV&V. Please list Responsible person & Monitoring Indicators <br /> 8. Tank Information: Section VI. Riser secondary containment should be fiberglass <br /> Thuy Tran, Sr. REHS <br /> Senior Registered Environmental Health Specialist <br /> 12/8/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.