My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
550
>
2300 - Underground Storage Tank Program
>
PR0536555
>
INSTALL_2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2019 3:22:40 PM
Creation date
11/8/2018 9:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2012
RECORD_ID
PR0536555
PE
2351
FACILITY_ID
FA0020989
FACILITY_NAME
Arco. Am pm 83333
STREET_NUMBER
550
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
Rd
City
Tracy
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
550 W Valpico Rd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\V\VALPICO\550\PR0536555\INSTALL PLAN 2012.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ONLY apply fiberglass strip"horizontally (ACROSS the piping sump, not up and down.) <br /> The completed glass job should be air-free, seamless and ripple-free as shown in Fig. H.9.3. <br /> Fig. H.9.3 <br /> Fig. H.9.1 Fig. H.9.2 <br /> Roll over the fiberglass mat many times with a Chamfer roller (provided) on the OUTSIDE JOINT <br /> to make sure it is cleanly adhered to the fiberglass piping sump walls. Run the roller up and down to <br /> force any air out from under the fiberglass strip. (Fig. H.9.2) <br /> H.10 - Repeat Steps H.4 to H.9 and apply fiberglass strips to the INSIDE JOINT of the piping <br /> sump. (Fig. H.10.1) For the INSIDE fiberglass strips use a Barrel roller to apply the strips to the <br /> curved surface. (Fig. H.10.2) <br /> Fig. H.10.1 Fig. H.10.2 Fig. H.11 t <br /> H.11 - Use a Chamfer roller to carefully rollover the applied fiberglass strips to run out any air <br /> bubbles. (Fig. H.11) <br /> H.12 - Allow at least 4 hours at 75 Degrees to cure. During this time, continue on to other sumps. <br /> H.13 - When all fiberglass applications have cured, sand them down Fig. H.13 <br /> lightly with air-sander or roughly with coarse 40 - 60 grit sandpaper all <br /> the way around the piping sump to knock down all excess fiberglass 'hair' " <br /> and material. (Fig. H.13) <br /> H.14 - Mix resin and apply with paint roller, completely covering the <br /> fiberglass material all the way around the piping sumps. Roll resin generously <br /> with paint roller. DO NOT USE PUTTY KNIFE or other scraping tool.The resin needs to be applied generously and evenly. (Fig. H.14) NJ <br /> H.15 - Now install any other equipment in the piping sump(s) that was not <br /> installed yet. Install all necessary equipment per local code & regulations. <br /> Follow installation instructions / recommendations / warnings provided by <br /> equipment manufacturer(s). <br /> 15 ii-B401-DW-SP-10A <br />
The URL can be used to link to this page
Your browser does not support the video tag.