Laserfiche WebLink
EQUIPMENT DRY-FIT <br /> - BEFORE INSTALLING PENETRATION FITTINGS <br /> - BEFORE CUTTING OPEN SUMP INTERSTICE <br /> DRY-FIT YOUR SUMP PIECES AND INTERNAL EQUIPMENT. <br /> BEFORE PENETRATING FIBERGLASS <br /> AWARNING WALLS ENSURE THAT THE DOUBLE WALL FRP <br /> SUMP IS HOLDING VACUUM <br /> • It is REQUIRED to visually check the Vacuum gauge on each and <br /> y ,� every BravoSystems Double Wall product and write on its packaging <br /> report Vacuum level, signature of observer, date and time the <br /> shipment is received at every destination. <br /> WARRANTY IS VOID : <br /> IF ANY OF THE FOLLOWING OCCUR <br /> A) There is a failure to comply with the Required written report guidelines as stated above. <br /> B) Double Wall Products are DOUBLE-STACKED, stored or shipped in a negligent way. <br /> Ci) There is a failure to handle Bravo Systems equipment with the utmost care. <br /> D) Any packaging or wrapping materials are removed before the item reaches It's destination. <br /> E) Double Wall Sump Products, Failure to call Bravo Systems If Vacuum level on product is <br /> less than 12" HG (Vacuum) (323) 888-4133, refer to sump for further details. <br /> F) If there is any indication or suspect damage, you must mark the freight paperwork <br /> "Suspect Freight Damage" <br /> 3 ii-B8000-9000-DW-11B <br />