Laserfiche WebLink
B.6 - Close off ball valve completely and <br /> prime the open ended 36" length of clear tubing #� <br /> with provided Interstitial Fluid. A liquid funnel is j f <br /> recommended. <br /> �AWARNIN <br /> Filling Bravo Systems Double Wall Products with <br /> Brine (saline) solution will void the product warranty. You must use <br /> only Bravo-Supplied Interstitial Fluid. <br /> AIR <br /> Gauge _> <br /> Barb & <br /> Ball Valve -� <br /> Assembly <br /> Liquid Source: <br /> Bucket filled <br /> with Interstitial <br /> Fluid. <br /> B.7 . After filling the tubing all the way to the ball valve, insert open end into your liquid source. <br /> (5 gallon bucket filled with fluid is recommended.) <br /> B.8 - When ready, pull vacuum using the Venturi Vacuum Assembly (sold seperately) to 20 Inches <br /> of mercury. Then SLOWLY open ball valve and allow Interstitial fluid to flow freely into the system. <br /> ! ...SLOWLY open ball valve.. . <br /> B.9 - STOP PULLING VACUUM WHEN THE LIQUID IS 2-3 INCHES FROM THE VERY TOP OF <br /> THE INTERSTITIAL SPACE / TEST PORT. This is easily visible while filling the DoubleWall <br /> Product. <br /> 8 ii-B8000-9000-DW-11B <br />