My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
550
>
2300 - Underground Storage Tank Program
>
PR0536555
>
INSTALL_2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2019 3:22:40 PM
Creation date
11/8/2018 9:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2012
RECORD_ID
PR0536555
PE
2351
FACILITY_ID
FA0020989
FACILITY_NAME
Arco. Am pm 83333
STREET_NUMBER
550
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
Rd
City
Tracy
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
550 W Valpico Rd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\V\VALPICO\550\PR0536555\INSTALL PLAN 2012.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D) ATTACHING THE MANOMETER <br /> DA -At this point, after the ALDP test, the interstice should still be holding vacuum. Maintain 20" of <br /> Vacuum and slowly open ball valve to let fluid into the interstice until it exits the venturi assembly. <br /> Visually check whether the fluid level reaches the top of the interstitial space. <br /> • D.2 - Cut the barb & ball valve assembly free by cutting the <br /> tubing just below it and connect open end of tubing to the <br /> bottom of the primary Manometer. <br /> 0 <br /> D.3 - Cut the Tee and Gauge assembly free by cutting the <br /> tubing just below it and connect open end of tubing to the <br /> bottom of the atmospheric manometer. adjust atmospheric <br /> manometer bracket so the manometer is in a position clear of <br /> obstructions. <br /> DA - It is not uncommon for some interstitial fluid to be lost <br /> while connecting the tubing to the primary manometer. This is <br /> ok. Replace lost fluid by topping off manometer with interstitial <br /> Cut off barb fluid until the liquid level reaches just 2 inches below the top <br /> & ball valve of manometer. <br /> assembly -0,5 - Hydrostatic Field Wegrity Test <br /> Mark the date and time of test and manometer level. Allow 1 hour <br /> to look for a change in level. No change in level or visible leaking <br /> means box passes test. <br /> D.6 - If interstitial test fluid changes its level more than 1/4", <br /> visually look for any signs of leaking around fittings both interior and <br /> exterior to sump. Pay special attention to field installed fittings. <br /> NOTE: If you have completed the Air Integrity Test without <br /> problems, and completed the Vacuum Hydrostatic Method of <br /> filling and still have problems with sump integrity, Contact the <br /> D Factory, <br /> W <br /> nE <br /> � E o0 <br /> Co 0 <br /> E E m D.7 - If interstitial monitoring is required, install a California Listed <br /> ` m Q <br /> o g Hydrostatic Sensor (LG-113) using the sensor manufacturer's fitting. <br /> Run the sensor cable through the cap assembly. The electronic <br /> liquid level sensor should be set at the bottom of the primary (larger) <br /> manometer reservoir. Follow your leak detector manufacturer's <br /> installation instructions. Cover the manometer with cap and fasten <br /> Electronic liquid with wire and lead crimp seal. <br /> level sensor is <br /> installed inside P-Traps OK since vacuum fill method leaves no room for air. <br /> primary manometer <br /> 11 ii-B8000-9000-DW-11B <br />
The URL can be used to link to this page
Your browser does not support the video tag.