My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
550
>
2300 - Underground Storage Tank Program
>
PR0536555
>
INSTALL_2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2019 3:22:40 PM
Creation date
11/8/2018 9:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2012
RECORD_ID
PR0536555
PE
2351
FACILITY_ID
FA0020989
FACILITY_NAME
Arco. Am pm 83333
STREET_NUMBER
550
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
Rd
City
Tracy
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
550 W Valpico Rd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\V\VALPICO\550\PR0536555\INSTALL PLAN 2012.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BRAVO ELECTRICAL OFFSET FRAME <br /> INSTALLATION INSTRUCTIONS <br /> Make sure all electrical conduits and piping are clear of <br /> any equipment or other obstructions in the dispenser. <br /> Physically check your hydraulic cabinet for obstructions before any installation begins. <br /> BRAVO UNDER DISPENSER CONTAINMENT ELECTRICAL OFFSET INSTRUCTIONS <br /> The Frame should be fully installed and sealed with provided Vulkem before conduit installation. <br /> 2) Make sure all electrical conduits (piping) are clear of any equipment in the dispenser. Physically <br /> check your hydraulic cabinet for obstructions before any installation begins. <br /> 3) Conduits must be run and tightly secured to the sump. <br /> 4) Pour concrete around outside of Dispenser Sump and within the conduit area. <br /> Special Instructions. Sloped <br /> 5) You must Slope concrete within the Electrical Area Concrete <br /> Electrical Offset opening between the <br /> steel frame walls. This area MUST be <br /> sloped and MUST be sealed at the areas — �� Steel <br /> shown below. Lip <br /> Concrete Island <br /> as <br /> Sump <br /> 4 e.. w <br /> 4 . Interior <br /> Special Instructions. Sealed <br /> Areas <br /> 6) You must seal where concrete or conduit meets <br /> steel, as shown. Seal the downside of the slope and <br /> the conduit area with Vulkem 116 or TremPro 650. <br /> a' <br /> a ° < =1n <br /> a. ea <br /> e < < . . '4 0 <br /> i i-EO-I n sta I I ation-2-5-08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.