My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
550
>
2300 - Underground Storage Tank Program
>
PR0536555
>
INSTALL_2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2019 3:22:40 PM
Creation date
11/8/2018 9:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2012
RECORD_ID
PR0536555
PE
2351
FACILITY_ID
FA0020989
FACILITY_NAME
Arco. Am pm 83333
STREET_NUMBER
550
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
Rd
City
Tracy
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
550 W Valpico Rd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\V\VALPICO\550\PR0536555\INSTALL PLAN 2012.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BRAVO ' <br /> SYSTEMS <br /> Extended Electronic `� Interchangeable <br /> Monitor Housing dispenser frame allows <br /> (Sensor not included) future dispenser upgrades <br /> without breaking concrete <br /> Pat. # 5,800,143 <br /> Reinforced Doublewall <br /> fiberglass manufacturing - <br /> process allows liquid fill time Monitoring Fluid: <br /> to be measured in minutes <br /> Propylene Glycol will <br /> not freeze, corrode <br /> F-Series Fittings or contaminate <br /> available for Smith \� <br /> and Ameron pipe, <br /> including LCX RECOMMENDED: <br /> s' F-Series Fiberglass Fittings <br /> FACTORY INSTALLATION <br /> Dimensions: Details at www.sbravo.com/f s <br /> Width: 20" <br /> Depth: 29" <br /> Length: Lrg Med Sm <br /> 42" 30" 25.5' 1 <br /> Ships from factory under <br /> continuous vacuum test <br /> through factory-installed <br /> combination gauge <br /> Eliminate Electrical Boots! <br /> Part adder"EO-FRM" CALL USI <br /> allows you to run for Advantage, <br /> Eliminate Potential Leaks! conduit outsideofthe Vistaand <br /> sump for most Wayne-Vac <br /> equipped <br /> retail dispensers Vista dispensers <br /> Reduce Labor & Liability! SEE PRICELIST FOR ADDITIONAL DETAILS <br /> Third Party Approved Patent#6,823,886 u <br /> ti8g AB-2481 Compliant Other Patents Pending C L US LISTED <br /> S. Bravo Systems. Inc. - The Leader in Neondarg Containment 1) / <br /> MEMBCR <br /> 2929 Vail Ave. I Commerce, CA 1323-888-4133 1 FAX: 323-888-4123 1 www.sbravo.com 10B <br />
The URL can be used to link to this page
Your browser does not support the video tag.