My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
550
>
2300 - Underground Storage Tank Program
>
PR0536555
>
INSTALL_2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2019 3:22:40 PM
Creation date
11/8/2018 9:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2012
RECORD_ID
PR0536555
PE
2351
FACILITY_ID
FA0020989
FACILITY_NAME
Arco. Am pm 83333
STREET_NUMBER
550
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
Rd
City
Tracy
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
550 W Valpico Rd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\V\VALPICO\550\PR0536555\INSTALL PLAN 2012.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DOUBLEWALL TRANSITION • ` <br /> 11 1 • TRANSITION <br /> M MANUFACTURED • <br /> _ BRAVO •. HYDROSTATIC •- VACUUM MONITORING <br /> SYSTEMS <br /> Rigid Celcon compression Planter style <br /> _ Dual structural type above ground fittings epoxy steel <br /> support sleeves for 2" piping are UV and access cover Fluid reservoir <br /> P weather resistant, with lock tabs <br /> for Rack System for visual inspection <br /> & electronic sensor <br /> (SENSOR NOT INCLUDED) <br /> Positive <br /> concrete <br /> anchoring <br /> Epoxy coated 96" <br /> steel midframe GRAD <br /> available with <br /> galvanized or <br /> stainless options <br /> Recommended: <br /> F-Series-D all FRP Interstitial <br /> permanent entry fittings fluid included <br /> Jr IL <br /> Options for <br /> . Structural <br /> T Anchoring of <br /> Veeder CCVP <br /> (California) <br /> All sumps ship j <br /> with a combo Contact <br /> gauge Installed �� factory Recommended: <br /> & under 20"Hg for more Electrical Offset - EO Recommended: <br /> vacuum or more __j information Eliminate conduit Bravo Rack System <br /> for continuous monitoring entry fittings <br /> Part # RS-500 <br /> Optional rigid <br /> penetration fitting <br /> for 3" diameter Third Party Approved O 21MU Patented 6,823,886 <br /> piping. 1-1/2" option UL LISTED Other Patents Pending <br /> also available. AB-2481 Compliant <br /> S. Bravo Systems, Inc. - The Leader in Seeondary Containment 1yPE1 <br /> MEMBER <br /> 2929 Vail Ave. I Commerce, CAI 323-888-4133 I FAX: 323-888-4123 1 www.sbravo.com 11A <br />
The URL can be used to link to this page
Your browser does not support the video tag.