Laserfiche WebLink
AINLAY TANK TIGHTNESS TEST No. `f (U/A5 O.L <br /> 10 INCLUDE ENOUGH INFO. TO ACCURATELY IDENTIFY TANK. IN UMBER/CONTENTS I POSITION, ETC.) <br /> TANK I.D. �� S ��1 I, '7311-z " INS <br /> TANK DIAMETER INS FILL PIPE LENGTH <br /> INS Icl END WATER IN TANK INS <br /> WATER IN (a)START WATER IN TANK <br /> + TANK (b)START WATER IN TANK GALS (d)END WATER IN TANK GALS <br /> 12 (a) NOMINAL CAPACITY oO U — GALS (c) DEDUCT WATER IN TANK GALS <br /> \\l PRODUCT ( I GALS (d)TOTAL PRODUCT VOL. ) O ( I GALS <br /> T ' (bl ACTUAL CAPACITY (e) PIPING I U GALS <br /> VOLUME (FROM TANK CHART) (f) TOTAL I UZI GALS <br /> `1 13 (a) HEIGHT OF WATER TABLE ABOVE TANK BOTTOM `/ (h) INS <br /> (b)DENSITY OF TANK PRODUCT = • a 3� I.) LBICU. IN. (FROM TABLES) <br /> FILL DENSITY OF EXTERNAL WATER - 0.038 LBICU. IN. <br /> Ihl • 0.038 ■ 0.038 �" INS <br /> PIPE (cl ADDITIONAL HEAD REQUIRED - lWl . G 3 / _ <br /> EXTENSION NOTE: <br /> TO AVOID POSSIBLE TANK DAMAGE THE ADDED PRESSURE FROM A FILL PIPE EXTENSION MUST NEVER <br /> EXCEED 5 P.S.I. <br /> 14 <br /> (a) A.P.I. GRAVITY f AT °F <br /> Z PRELIM (b)A.P.I. GRAVITY 27" AT 60°F <br /> TEST DATA (c) COEFF.OF EXPANSION LYX�U'3'S SC' T <br /> rz O <br /> U <br /> ~ ~ 15 (a) START TEST. I D'.Z C1 ®PM: END TEST ' '"U AM/45 TEST TIME 12o MINS. <br /> w w <br /> ' TEST <br /> (b) T MPERATUR CHANGE DURING TEST = (SLOPE OF"BEST FIT" LINE) • (TEST TIME) <br /> DATA c j f ev^�. - (k7Ufaq IZOC- <br /> I , °F. <br /> N E{'7� -G.vn <br /> (c) VOL. CHANGE DUE TO TEMP = PRODUCT VOL . TEMP. CHANGE - COEFF. EXP. <br /> 02n.--07-7n5bl.,Oc IY3SS1414cl GALS. <br /> ( (d) TOTAL LIQUID VOL. ADDED/SUBTRACTED AT END OF TEST................... _�-� ,039 GALS. <br /> ,G -'} �" <br /> � I (e) VOL. CHANGE NOT DUE TO TEMP((q * (d)(......... _ _L1344 + 63 GALS. <br /> p (Q LEAK RATE = <br /> lel•60 -F .GUS •60 -_ '�3 G.P.H. <br /> TIME OF TEST SMINS) 2Q 115a1 <br /> THIS LEAK RATE DOE /DOES NOT EXCE E STANDARD OF 0.050 G.P.H. DESCRIBED IN NATIONAL <br /> FIRE PROTECTION A 'LEn N.F P.A. 329. <br /> THE TANK IS TIGHT�s/ THE TANK IS NOT TIGHT Cl <br /> 16 <br /> /` <br /> NOTES <br /> N <br /> W <br /> cc <br /> 0] <br /> 0 Q <br /> Lic.# 92-1120 <br /> Technician : Y�"" <br />