My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
930
>
2300 - Underground Storage Tank Program
>
PR0502817
>
INSTALL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 11:47:23 AM
Creation date
11/8/2018 9:58:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1998
RECORD_ID
PR0502817
PE
2361
FACILITY_ID
FA0005584
FACILITY_NAME
VALLEY PACIFIC LODI PLANT & CARDLOCK
STREET_NUMBER
930
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905023
CURRENT_STATUS
01
SITE_LOCATION
930 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\V\VICTOR\930\PR0502817\1998 INSTALL.PDF
QuestysFileName
1998 INSTALL
QuestysRecordDate
5/19/2016 4:17:30 PM
QuestysRecordID
3086423
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEW UST INSTALLATION INSPECTION RECORD <br /> s <br /> FACILITY NAME: (ypCG Gy D/L ►'�A 2�Lc+✓L� ADDRESS: q3D <br /> FACILITY ID# TANK# '557768" U0TANK MCOEL/MATERIAL• w4•�pgIIO' <br /> CAPACITY: % CDD 61 PRODUCT: ✓/L R.E.H.S: Tesv�r <br /> A I <br /> P N ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE <br /> P i WITH MANUFACTURER WRITTEN SPECIFICATIONS <br /> R T <br /> 0 I <br /> V A <br /> E L <br /> D S <br /> ITEM OR EQUIPMENT INSPECTED <br /> DATE <br /> 1. UST PLANS SUBMITTED/ FEES PAID (H+S CODE 25287) <br /> UST INSTALLATION PLANS APPROVED <br /> INITIAL INSPECTIONS <br /> y / j INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br /> VACUUM: / SOAP: PSI: u4otr?�/j BRINE(LIQUID ANNULAR): OTHER: <br /> 7 ,� `v 4, PRIMARY TANK TEST: PSI: HRS/MIN: <br /> TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL (API/PEI) <br /> PIPING INSPECTIONS <br /> 6. PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIN) © 7 ?�p � (CCR 2636 (e)) <br /> N / ✓ i SECONDARY PIPING CONTAINMENT TEST PSI:C D OTHER: (CCR 2636 (e)) <br /> 8. LAKE TEST ON ALL SUMPS (24 HR. MINIMUM) HRS: (CCR 2635 (a) (4)) <br /> I/f 6 ✓I 9. UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED PEI <br /> 10. OVERSPILL PERFORMANCE TEST (CCR 2635 (b) (1) (C)) <br /> y D 11. ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2636 (b)) <br /> / 12. PIPING SLOPES TO COLLECTION SUMP (CCR 2636 (c)(1)) <br /> FINAL INSPECTION <br /> 13. PERFOR14ANCE TEST FOR "ALL" MONITORING PROBES (CCR 2632 (c) (2)) <br /> 14. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) (CCR 2632 (c) (2)) <br /> 15- PERFORMANCE TEST OF LINE LEAK DETECTION (CCR 2643 (c) (1)) <br /> t7/ G <br /> 6. PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF (CCR 2636 (g)) <br /> 17. BALL FLOAT VALVES INSTALLED <br /> 18. OVERFILL PROTECTION INSTALLED/APPROVED (CCR 2635 (b) (2)) <br /> / 19. TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) API <br /> 6/ v 0. TANK INTEGRITY TEST (PASSING HARD COPY) (CCR 2635 (a) (5)) <br /> 21. MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE (CCR 2632 (d)) <br /> 9 22. "Cl- FORM COMPLETED AND SUBMITTED (CCR 2635 (d)) <br /> 23. MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED (CCR 2630-2636) <br /> b�2 9 V L ALL CONDITIONS MET; FACILITY PERMIT ISSUED (H*S CODE 25284) i <br /> VAPp2 t qC T2— T_( //3_�co� F ✓E i r�G l� 5 � t�16 > � OS u <br /> COMMENTS: '5o A/5 <br /> EH23-006 7/97 <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.