Laserfiche WebLink
Three complete setsfte plans (include manufacturer's specificati sheets for proposed equipment to be installedi <br /> ,2. Plans drawn to scale in non-erasable print. <br /> Plot plan to show Location of tanks and all associated piping. <br /> 4, _Z Striker plates or drop tube-mounted bottom protectors illustrated below all accessible openings. <br /> 5, J/ Tank cross-sectional diagram. <br /> �I p<. <br /> Detail of tank, associated piping, excavation and cover, cc�.e�iCsw "" <br /> b. P�P � S rccA'uwd-t3.a� <br /> 7, v Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, chapter 16, <br /> Article 3, Section 2631 (b) & 26351 <br /> B, Verification of product compatibility with the tank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, etc. <br /> 9. Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br /> 10. 1/ At the installation site, prior to installation, a tightness test shall be performed on both primary (I') and <br /> / secondary (20) containment systems before covering. [Section 2635 (a) (3) & (4)1 <br /> 11. ✓/ Tank integrity test required upon completion of installation with tank in operating condition. Test results to h <br /> submitted directly to PHS-EHD from the testing company or owner of facility. [Health & Safety Code, Division 20 <br /> Chapter 6.7, Section 25291 (h)] <br /> 12. TANK COMPOSITION <br /> TANK # # 1 # z # # # <br /> CAPACITY 9 , 000 3 ' 000 <br /> MANUFACTURER Modern Modern <br /> COMPOSITION Steel Steel <br /> Double juuuule <br /> MODEL Alalled <br /> PRODUCT <br /> CORROSION PROTECTION Fibergla s Reinforced Plastic <br /> U.L. LISTED 1746 1746 <br /> COMPATIBILITY WITH 100: X X <br /> METHANOL <br /> 13. TANK(s) TO BE INSTALLED <br /> X A. Steel-clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br /> coatings or coverings. <br /> (1) Tested at the installation site using an electric resistance holiday detector. <br /> X (2) Vacuum applied to interstitial space. <br /> _ B. Fiberglass <br /> (1) Installation instructions require an air test and soap bubble test prior to installatic <br /> (2) Vacuum applied to interstitial space. <br /> (3) Hydrostatic annular (primary tank pressure test). <br /> _ C. Non-clad steel tank [Section 2635 (a) (2) (A)] <br /> _ (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washe <br /> etc.). <br /> _ (2) Field installed cathodic protection systems designed and certified as adequate by a <br /> corrosion specialist. <br /> (3) Impressed current systems to be inspected no Less than every 60 days. <br /> 5 <br />