Laserfiche WebLink
<ers). <br /> Piping (cross-sectional .ram, including connections to Sank and disp��".�/ <br /> � with overfill pTpvencion system that: <br /> .!'.+ tA1 Vent and tank riser primary containment system <br /> equipped <br /> Restricts delivery of flow to tank (Section 2635 (b) (2) (a) or (C)1, or <br /> Provide positive shut off of flow to the tank at nc more than 95 % CSection 2635 (b)(2)(C)7, or <br /> (B) Vapor recovery piping designed so it cannot contain liquid phase product, or <br /> operates at Less than atmospheric pressure) CSection 2636 (a) (3)1 <br /> (C) Suction piping [below grade piping <br /> Sloped so contents of the pipe will drain back into the storage tank if the suction is <br /> released. <br /> _ No valves or pumps installed below grade. <br /> _ inspection method provided to demonstrate compliance with section 2636 (a) (3). <br /> (D) <br /> Corrodible underground piping protected against corrosion (Section 2636 (b)). <br /> (°1 Underground primary piping will meet all of the following requirements <br /> - with hazardous substance under normal operation conditions shall be: <br /> Primary piping in contact <br /> installed inside a contact <br /> irment system in the form of: 'X __secondary pipeVault or <br /> Lary Gonia <br /> _tined trench to be sloped to a collection sump at the low point of the piping. <br /> -g Primary piping and secondary containment systems will be installed in accordance with industry <br /> code of practice and voluntary consensus standards-. <br /> _ Lined trench used as secondary containment <br /> _ Material compatible with the substance stored. <br /> _ Covered and capable of supporting any expected vehicular traffic. <br /> (F) Underground piping with seccndary containment will be equipped and monitored as follows: <br /> X Secondary containment will be equipped with a continuous monitoring system connected to an audibl <br /> and visual alarm system. <br /> 1 Automatic Line leak detectors will be installed an pressurized piping <br /> manufacturer: P'c� I.,ke t _ Model: F" —1 <br /> _ Annual monitoring will be conducted on the pressurized piping with secondary containment. <br /> X Annual line tightness test will not be required if the continuous monitor shuts down the putrp aM <br /> activates the alarm system when a release is detected and when the continuous monitoring system <br /> faits or is disconnected. <br /> 20 _Z State Water Resources Control Board "Facility (A)" and "Tank Permit (B)" application forms submitted. <br /> 21 / Plan review and operating permit fees paid. � <br /> i <br /> 22 ✓/__, What is the approximate depth to ground water: 7 3 <br /> (include source of information - borehole lags, monitoring ueLl data, wager <br /> studies, etc.) m ami - o y, <br /> 23. J Total number of tanks cn site after installation: �- <br /> 24 ✓ County/City Fire District and Building Department notified. <br /> 25 / In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br /> responsibility [in accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br /> Requirements] as an remediation or operatactivitiesor <br /> c For ufurtherit a wassistance contacLan to Ot the esite Mitigatgation iontUnit atprior t(209)c469-3450. <br /> assessment <br /> The owner or opera r•Mu . acknowLedge this responsibility for workpLan submittal by signature and date below. <br /> r�:O1 LC� _� Date �' i t 11 <br /> . Name Title <br /> CONDITIONS OF APPROVAL: I <br /> r - v rr o• r <br /> D �- <br /> D. G! <br /> S <br />