My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_JUN 2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
930
>
2300 - Underground Storage Tank Program
>
PR0502817
>
COMPLIANCE INFO_JUN 2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2019 4:51:00 PM
Creation date
11/8/2018 9:58:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
JUN 2016 - 2018
RECORD_ID
PR0502817
PE
2361
FACILITY_ID
FA0005584
FACILITY_NAME
VALLEY PACIFIC LODI PLANT & CARDLOCK
STREET_NUMBER
930
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905023
CURRENT_STATUS
01
SITE_LOCATION
930 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\V\VICTOR\930\PR0502817\COMPLIANCE INFO\COMPLIANCE INFO JUN 2016 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO JUN 2016 - PRESENT
QuestysRecordDate
9/13/2016 6:46:00 PM
QuestysRecordID
3135584
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S W RCB,January 2002 Page=of <br /> 4. SECONDARY PIPE TESTING <br /> Test Method Developed By 'Piping Manufacturer x Industry Standard Professional Engineer <br /> .7 Other ISpedfy) <br /> Test Method Used: x Pressure Vacuum __Hydrostatic <br /> Other(Specif)) <br /> Test Equipment Used:4"dial gauge Equipment Resolution:: 15 psi <br /> Piping Ran#87 Piping Ron#87 South North piping Run# Pipi0g Rao# <br /> Piping Material: FRP FRP <br /> Piping Manufacturer: Ameron Atrxron <br /> Piping Diameter. 3" 3" <br /> Length of Piping Run: 25' 25' <br /> Product Stored: 87 87 <br /> Method and location of Test hoot Test boot <br /> piping-run isolation: <br /> Wait time betwem applying <br /> pressureNscuuMwater and 30 min. 30 min. <br /> startin test <br /> Test Start Time: 1:05 1:05 <br /> Initial Reading(W): 5.0 PSI 5.0 PSI <br /> Test End Time: 2:05 2:05 <br /> Final Reading(Rr): 5.0 PSI 5.0 PSI <br /> Test Duration: I HR. I HR. <br /> Change in Reading(RR,): 0 PSI e.0 PSI <br /> Pass/Fail Threshold or 0 PSI 0 PSI <br /> Criteria: <br /> TedRmft X Pass ❑Fail X Paso ❑Fail O Pass Dpail ❑par OFA <br /> COMMents—(include information on repairs made prior to testing,and recommended Blow-up far jailed tuts) <br />
The URL can be used to link to this page
Your browser does not support the video tag.