My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
6732
>
2300 - Underground Storage Tank Program
>
PR0231830
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:38:43 PM
Creation date
11/8/2018 9:59:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0231830
PE
2361
FACILITY_ID
FA0004030
FACILITY_NAME
THREE PALMS GROCERY
STREET_NUMBER
6732
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10110001
CURRENT_STATUS
02
SITE_LOCATION
6732 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\W\WATERLOO\6732\PR0231830\COMPLIANCE INFO.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s" <br /> .001 <br /> WRITTEN MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times. The information on this monitoring <br /> program are conditions of the operating permit The permit holder must notify San Joaquin County <br /> Environmental Health Division, phone (209) 468-3420 within 30 days of any changes to the monitoring <br /> procedures, unless required to obtain approval before making the change. <br /> Required by Sections 2632(d) and 2641(h) CCR <br /> Facility Name <br /> Facility Address_L Z? <br /> A. Describe the fie uency of performing the monitoring: <br /> Tanker �`o Grp <br /> f✓ �T(zo )\c 11Vlr��t ra�c�Et Pr,�� <br /> Piping W tuwLik <br /> B. What methods and equipment, identified by time and model, will be used for <br /> performing the monitoring: <br /> Tank is tit '7 EC 1 cr2�n� c i�oµ�� �e sr r�/7�G <br /> Piping <br /> C. Describe the location(s) where the monitoring will be performed (facility plot plan <br /> shoId be attached): <br /> �G4TF0 C") /1 acv A <br /> D. List the name(s) and title(s) of the people responsible for performing the monitoring <br /> and/or maintaining the equipment <br /> �;o�ka„J RvtcESr �r1�xt I�,G1 G� c (.L 144a-1,JriglJ <br /> L4 AF <br /> E. Reporting format for momt <br /> * �ung: l <br /> Tank c>.6 ur ,& tC� AW) >°&gir--s GEl E¢ (cE4 l sO�JS <br /> Piping W t w tae C&�6eFf�n l4r �` A� Tum <br /> F. Describe the preventive maintenance schedule for the monitoring equipment. Note: <br /> Maintenance must be in accordance with the manufacturers' maintenance schedule <br /> but not less than every 12 months:C*IP--c — 2Q 6'2A} 663 6J IZW' t1 Fac&ezz <br /> ! Z Gam-t'—ttS <br /> G. Describe the training necessary for the operation f UST system, including'ipin , <br /> and the monitoring equipment• �-ra� Vic� � u E'-''�� <br /> �JIGGSc i Ltd !Q L� a a/L FcF.sS✓+2e 1 2son AL f�/ <br /> u <br />
The URL can be used to link to this page
Your browser does not support the video tag.