Laserfiche WebLink
F. In-Tank Gauging/SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com tete the followingchecklist: <br /> ➢fl Yes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes > No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ® No* Was accuEacy system product level readings tested?❑ Yes ® No* Was accuf system water level readings tested?❑ Yes No* Were all reinstalled properly? <br /> Yes ❑ No* ere all in ment man er's maintenance checklist <br /> *In the Section H,below,describe how and when these de tctencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): Q Check this box if LLDs are not installed. <br /> Com tete the foTForequipmlent <br /> klist: <br /> ❑ Yes ❑ Npment start-up or annual equipment certification, was a leak simulated to verify LLD perNll that apply) Simulated leak rate: ❑3 g.p.h.; ❑0.1 g.p.h; ❑0.2 g.p.h. <br /> ❑ Yes ❑ NLLDs confirmed operational and accurate within regulatory requirements? <br /> ❑ Yes ❑ Ntesting apparatus properly calibrated? <br /> ❑ Yes ❑ Nhanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑ N/A or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> L3 N/A or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: Safe suction system <br /> No inventory probes — sensors only <br /> Page 3 of 3 3v; <br />