My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
6732
>
2300 - Underground Storage Tank Program
>
PR0231830
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:38:43 PM
Creation date
11/8/2018 9:59:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0231830
PE
2361
FACILITY_ID
FA0004030
FACILITY_NAME
THREE PALMS GROCERY
STREET_NUMBER
6732
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10110001
CURRENT_STATUS
02
SITE_LOCATION
6732 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\W\WATERLOO\6732\PR0231830\COMPLIANCE INFO.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC HEALTH SERVICES Ao4A FC <br /> SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DIVISION <br /> Karen Furst, M.D., M.P.H., Health Officer • �., <br /> 'rG%Fti'hd� <br /> 304 East Weber Avenue, Third Floor • Stockton, CA 95202 <br /> 209/468-3420 <br /> Oil Equipment Service <br /> Attn: Keith Tallia <br /> P.O. Box 950 <br /> 750 Industrial Way <br /> San Andreas, CA 95249 <br /> Re: Three Palms Grocery @ 6732 E. Waterloo Rd. Stockton, CA <br /> Your application for permit to install the Western Fiberglass@ all-fiberglass under <br /> containment pans and Incon@ monitoring panel with printer and sump sensors has been <br /> approved with the following conditions: <br /> 1. Contact the fire department for any applicable permits. <br /> 2. A soil sample is to be collected and analyzed as indicated in the attached <br /> minimum verification analysis. Analytical result shall be submitted to <br /> Environmental Health Division(EHD). <br /> 3. Submit sampler and laboratory information to EHD for approval prior to <br /> commencing work and/or scheduling any inspection appointment. <br /> 4. Contact EHD for the following inspections: <br /> a. Soil sampling below each dispenser. <br /> b. Pressure test on primary and secondary lines. <br /> c. 24-hour lake test. <br /> d. Final inspection. <br /> 5. All lines shall be tested for line tightness in accordance to manufacturer's <br /> guidelines by a licensed tank tester. Result is to be submitted to EHD prior to <br /> placing the tank in service. <br /> 6. Submit As-Built plan to EHD prior to scheduling final inspections. <br /> 7. Permit expires on 3/18/02. <br /> If you shall have any further questions, please contact me at (209)468-3459. <br /> \-aHo1 <br /> Dennis H. Catanyag <br /> Environmental Health Specialist <br /> A Division of San Joaquin County Health Care Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.