Laserfiche WebLink
i 4 <br /> 1 8. a. Describe the meAiod that will be utilized to purge and/ inert the tanks : <br /> -* 1 a c <br /> ' b. Tank/Piping Hauler: <br /> Name 016ST01' _ <br /> 1 Address g,0 �6)( 23 4 C City ver 10.A, Zip �1 S b41 <br /> Phone No.( -Z- ) x[3.7 $ <br /> 1 Hauler Registration#(if hauled as hazardous) ldo r 40.rrz- <br /> 1 c. Tank/PipingeDisposal Site: <br /> Name I A /(yam,t-' �`r,..d�(L.r]' L&-aju r <br /> tt <br /> 1 Address �� Q�k Z3(meg City �uv I o c4- Zip 9 <br /> Phone No. Zo <br /> 1 EPA ID#(if transported to a permitted TSD facility) �a til eYi_ <br /> 1 9. Is the sampling firm an independent third party from the contractor? YES 1"1 NO[] <br /> 9a. Describe,in detail,how the soil and/or water sampll�ls)beneath�h1e tank and piping}will be obtai ed: <br /> gAvI i&"(t35 'tisk.sti 2' L Glr: Ir tr�y�tis' DottPYti tIn CD 7�rrte V(t �el. <br /> 1 �'�}rah hLol- tLk�KctKD T Y7rRSR(AT - <br /> 10. Describe how the excavation will be backfilled with <br /> ((suitable <br /> ffmaterial upon:removal: <br /> 1 ''� �x�VuiT•Otn t t� D�5 bwc�c`c����d ulS.�vicc`..tX[�tv[a-TtfW fM�Tt�(�i(a <br /> 1 it. Handling of excavated soil: <br /> a)What material will be used to line the tank pit and cover the stockpile? <br /> b)What will be the final destinationof the excavated stockpile? <br /> 1 tz6�i h o�, S> 'Vu (s� �.l l Vm i IT,;,LL Pa-Rt;, Lark`'[) t F C4 ottiGa� r c tat <br /> 1 c)Contaminated Soil Hazardous Waste Hauler: r Q( <br /> Name__j � t�LS((z Hauler Registration# 2 J v <br /> 1 Address City Zip <br /> Phone No. <br /> 0�1,,-ewt_ pho jL; 01 . <br /> Ga tzt��h �� �� t�c .���• r�� ( rt <br /> EH 23 046 (Revised 07/31/08) $ <br /> 1 <br />