My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_2005 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 3:06:28 PM
Creation date
11/8/2018 9:59:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2008
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\W\WEST\4040\PR0231963\COMPLIANCE INFO 2005 - 2008.PDF
QuestysFileName
COMPLIANCE INFO 2005 - 2008
QuestysRecordDate
8/2/2018 5:38:18 PM
QuestysRecordID
3952805
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*1RE <br /> SAL <br /> California State Fire Marshal <br /> CODE INTERPRETATION <br /> Date Issued July 27, 2007 Interpretation 06-124 <br /> Topic Healy Clean Air Separator (CAS)Tank as a "Vapor <br /> Processing Unit" <br /> Code Sections) CFC 5202.13.3.9 <br /> Requested by <br /> The CalHornin State Fire Marshal has accepted the UL certification of the <br /> Healy Clean Air Separator(CAS) Tank as a "Vapor Processing Unit". 2001 <br /> CFC Section 5202.13.3.9 indicates that the vent termination from vapor <br /> processing units shall be not less than 8 feet above the processing unit <br /> itself. <br /> All of the Healy Installation materials and the California Air Resources <br /> Board Executive Order VR-202-A exhibits indicate that the underground <br /> storage tank pressure vacuum vent valve termination need only be located <br /> 12 feet above grade. No reference Is made to the 8 foot separation <br /> requirement <br /> We have two Questions for your consideration and Interpretation. <br /> 1. Does the UST pressure vacuum vent valve need to be located 8 feet <br /> above the CAS Tank as indicated on the attached Detail 11 <br /> No. The design of the CAS is such that all vapors from the UST are completely <br /> trapped within the "bladder contained in the CAS. The vent coming from the <br /> CAS is to vent the interstitial space between the bladder and the outside wall of <br /> the CAS. (See footnote below) <br />
The URL can be used to link to this page
Your browser does not support the video tag.