My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_2005 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 3:06:28 PM
Creation date
11/8/2018 9:59:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2008
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\W\WEST\4040\PR0231963\COMPLIANCE INFO 2005 - 2008.PDF
QuestysFileName
COMPLIANCE INFO 2005 - 2008
QuestysRecordDate
8/2/2018 5:38:18 PM
QuestysRecordID
3952805
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IPJQTALLATION INSTRUCTJQNS for <br /> HEALY SYSTEMS, I <br /> CLEAN AIR SEPARATOR <br /> The Model 9942, Healy Systems Clean Air Separator Installation consists of a 400 gallon steel tank <br /> assembly (9961) that contains a fuel resistant bladder to contain excess gasoline vapors that may <br /> develop in gasoline storage tanks during idle periods of gasoline dispensing facility operation. The <br /> tank assembly weighs approximately 800 pounds which makes it necessary to have a power <br /> assisted lifting device available at the installation site to remove the tank from the transportation <br /> vehicle and place it on the required concrete pad (see drawing B9900-9945). The pad (level within <br /> 1/8"/foot) is located within 100 feet to the storage tank vent lines. The pad is a requirement of this <br /> installation. DO NOT PLACE THE TANK DIRECTLY ON THE GROUND OR ASPHALT SURFACE. <br /> NOTICE: The installer is responsible to ensure that the installation meets the latest edition <br /> requirements of NFPA 30A, Chapter 10. No electrical connections are required. The tank <br /> securement method shown in drawing B9900-9945 shall be approved by the local authority having <br /> jurisdiction with respect to wind and seismic loading. <br /> In addition to the tank, there is a hardware kit that contains the following: <br /> 1 PressureNacuum vent valve (See Exhibit 1 of VR-201-A for model number) <br /> 4 Locking 1" NPT Ball Valves <br /> 4 Pad locks (keyed alike) <br /> 1 Breather Assembly, Healy Model 9948 <br /> 1 Vapor Inlet Assembly, Healy Model 9956 <br /> 1 Float Check Valve Assembly, Model 9466G <br /> Reference the appropriate Healy Systems installation drawing (C9900-9942, C9900-9971, 09900- <br /> 9972 or C9900-9973 of this manual) for placement of the above parts for the vent stack <br /> configuration required by the local Authority Having Jurisdiction (AHJ) for the UST system. The <br /> local contractor is responsible to provide all necessary, galvanized piping, non-hardening, UL <br /> classified pipe joint compound and plumbing fittings. Additional Pressure/Vacuum (PN) vent valves <br /> to complete installation are not included in the hardware kit. Healy is not responsible for the <br /> warranty of any other PN vent valve purchased to complete installation. <br /> The tank arrives at the site assembled and tested. All plumbing should be done using 1" galvanized <br /> steel pipe (Schedule 40) and approved nipples, as called out in the installation drawing appropriate <br /> for the site installation. Mounting hardware should be galvanized or stainless steel. Careful <br /> attention must be paid to the installation drawing appropriate for the site installation to assure proper <br /> operation of the bladder system. Do not inflate the bladder assembly after installation. <br /> It is important that the tank be secured to the concrete pad as shown in drawing B9900-9945 of this <br /> manual to prevent any unintentional repositioning of the tank as the connecting plumbing to the vent <br /> system is accomplished. <br /> Healy Systems, Inc. Website: http://www.healysystems.com <br /> 18 Hampshire Drive Email: sales@healysystems.corn <br /> Hudson, New Hampshire 03051 USA Telephone: 603.882.2472 <br /> ARB Approved Installation, Operation and Maintenance Manual (April 8, 2005) Fax 603.882.5189 <br /> Healy Systems, Inc. — the innovative leader of Stage It vapor recovery equipment <br />
The URL can be used to link to this page
Your browser does not support the video tag.