My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_2005 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 3:06:28 PM
Creation date
11/8/2018 9:59:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2008
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\W\WEST\4040\PR0231963\COMPLIANCE INFO 2005 - 2008.PDF
QuestysFileName
COMPLIANCE INFO 2005 - 2008
QuestysRecordDate
8/2/2018 5:38:18 PM
QuestysRecordID
3952805
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n <br /> n <br /> 11 <br /> n <br /> n <br /> n <br /> n <br /> u <br /> �N� Z <br /> ELEVATION HEALY CLEAN AIR SEPARATOR <br /> 11 <br /> U-) i <br /> a W 1O I <br /> EXISTING VENT LINE EXISTING BUILDING Q!: _ N <br /> N <br /> W M O <br /> 11 Q <br /> O <br /> 1/B'PITCH FT.PITCH T II 11 U J <br /> 11 EXISTING GASOLINE VENT RISER I I J O J Z <br /> 11 EXISTING EMERGENCE SHUTOFF i Y Q N W <br /> i I CONNECTION TO VENT RISER <br /> .11 SLOPE TOWARD VENTJ <br /> O <br /> 1/8"PER PITCH FT. I j m O � <br /> 1 — -- ------_JJ z W Q O <br /> N IL---- -------- O Z <br /> -------=-r---------- <br /> EXISTING FIRE EXTINGUISHER-- I I INSTALL(4)NEW o m W Q Q <br /> I BOLLARDS c (' Q_ N N <br /> 1 z \ (4'0"ON CENTER) z <br /> 1 ----^------------------ ` I(3'0-MIN.FROM TANK) �u <br /> I I r�. f- 1 \ 1 100'-0"MAX. INSTALL NEW 4'0'X 4'(r X B' <br /> Z i I p I i i I EXISTING GASOLINE PUMP ISLAND ii / I 10'-0'MIN. CONCRETE FOUNDATION PAD <br /> I 1 w 1 -- I IL__ / 1 �--REMOVE EXISTING AC AS NECESSARY <br /> L <br /> ------------------------- 0'-0 MIN.DSPE FOR INSTALLATION OF CONCRETE PAD <br /> = 1 I z I 1 REPLACE EXISTING GASOLINE DISPENSERS WITH <br /> C)_ PENSER <br /> I I y I I NEW SINGLE PRODUCT DRESSER WAYNE DES <br /> EXISTING TANK 1 1 ai 1 <br /> L-----------� EXISTING PUMP ISLAND DRIVE SLAB Z: <br /> ______ <br /> EXISTINGCANOPY--t'��---------------------------------� �� - —� � � <br /> � ice.^-------------------���� y I <br /> I / EXISTINGTANK I I w <br /> I <br /> EXISTING DIESEL PUMP ISLAND <br /> ---- <br /> 1 L I I / r------------------ -----J <br /> j `�----- l_-J-----moi I <br /> I <br /> a I <br /> EXISTING PUMP ISLAND DRIVE SLAB 1 <br /> �------------- ------' <br /> IY <br /> h— <br /> W U <br /> NO CHANGE TO EXISTING UNLESS NOTED W <br /> �w <br /> = Wz <br /> w o� <br /> Q N <br /> U <br /> WORK SCOPE <br /> J UZ O <br /> Erosion Control — SWPP REMOVE EXISTING ASPHALT AS NESSESSRY FOR FOUNDATION INSTALLATION. Q v C) U <br /> V) <br /> 1. Gather all debris on o regular basis and place them in dumpster or REMOVE (2) EXISTING GASOLINE DISPENSER. Z C N <br /> other container which is emptied or removed on o weekly basis. INSTALL (2) NEW SINGLE PRODUCT WAYNE DISPENSER AND <br /> DRAWN BY: OWN <br /> 2. When opproprite use tarps on ground to collect fallen debris or splatter that RE—CONNECT TO EXISTING ELECTRICAL. DATE: Br: OMY <br /> P <br /> could contribute to storm water pollution. INSTALL NEW 4'0" X 4'0" X 8 CONCRETE FOUNDATION. JOB NO: JOB <br /> 3. Remove all dirt, grovel, rubbish, refuse and green waste from the street INSTALL (4) NEW BOLLARDS. <br /> INSTALL NEW PHASE II EVR HEALY SYSTEM <br /> povment and storm drains adjoining project site during wet weather. CONNECT HEALY SYSTEM TO EXISTING VENT RISER <br /> 4. Broom sweep the public street povment adjoining project on a doily basis. <br /> 5. Coked on mud or dirt to be scraped from these areas before sweeping. <br /> 6. Protect storm drains from wind driven sediment using D. I. bogs, <br /> and silt fence as oppropiote. <br /> 7. All stock piled soil to be covered with visquine and held down by 1 of 1 <br /> sond bags and surrounded by strow waddle. <br />
The URL can be used to link to this page
Your browser does not support the video tag.