My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_2005 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 3:06:28 PM
Creation date
11/8/2018 9:59:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2008
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\W\WEST\4040\PR0231963\COMPLIANCE INFO 2005 - 2008.PDF
QuestysFileName
COMPLIANCE INFO 2005 - 2008
QuestysRecordDate
8/2/2018 5:38:18 PM
QuestysRecordID
3952805
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE SAFETY PLAN <br /> CLIENT NAME:_� � <br /> COMPANY NAME: <br /> PROJECT ADDRESS:4tt>A%r:> <br /> PROJECT NUMBER: <br /> A Site Safety Plan(SSP)has been designed to address safety provisions during the project. Its Purpose is to <br /> provide established procedures to protect all on-site personnel from direct skin contact, inhalation, or ingestion <br /> of potentially hazardous materials that may be encountered at the site. The SSP establishes personnel <br /> responsibilities,personal protective equipment standards,decontamination procedure, and emergency action <br /> plans. <br /> All personnel participating in the field must be trained in the general and specific hazards. All site personnel, <br /> project manager and/or site safety officer may impose any other procedures that they believe are necessary for <br /> safe operations. <br /> This plan is prepared to inform all field personnel,contractors, and subcontractors of the potential hazards on 1 <br /> the site. However,each contractor or subcontract must assume direct responsibility for his own employees' �J 1 <br /> health and safety. — <br /> PLAN PREPARED <br /> PLAN APPROVED BY. <br /> PLAN REVISED BY: <br /> POSSIBLE HAZARDS ON THE JOB: G <br /> 6. 11. <br /> 7. 12. <br /> 3. 8. 13. <br /> 4. 9. 14. <br /> 5. 10. 15. <br /> REQUIRED`PERSONAL PROTECTIVE EQUIPMENT FOR THE PROJECT: <br /> 1. 5. 9. <br /> 2. 6. 10. <br /> 3. 7. 11. <br /> 4. 8. 12. <br />
The URL can be used to link to this page
Your browser does not support the video tag.