My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_2005 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 3:06:28 PM
Creation date
11/8/2018 9:59:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2008
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\W\WEST\4040\PR0231963\COMPLIANCE INFO 2005 - 2008.PDF
QuestysFileName
COMPLIANCE INFO 2005 - 2008
QuestysRecordDate
8/2/2018 5:38:18 PM
QuestysRecordID
3952805
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DECONTAMINATION PROCEDURES <br /> Avoidance of contamination whenever possible is the best method for protection. Common sense dictates that <br /> on-site personnel avoid sitting, leaning, or placing equipment on possible contaminated soil. all personnel will <br /> be advised to wash their hands, neck and face with soap and water following each day's use. The following are <br /> other procedures necessary of decontamination process when applicable. <br /> Equipment <br /> Sampling: <br /> Construction: <br /> Solvents and Equipment used for decontamination process: <br /> Method of disposal: <br /> Method of disposal for any PPE Gear: <br /> INVESTIGATION DERIVED MATERIAL DISPOSAL: <br /> Drill cuttings/well water: <br /> Decontamination solutions: <br /> Other: <br /> MEDICAL SURVEILLANCE PROGRAM <br /> According to CFR29, 1910.120,Paragraph(F),employees who wear respirators thirty days or more during one <br /> year or who have been exposed to hazardous substances or health hazards above established permissible <br /> exposure limits are required to be monitored medically. All sitepersonnel will be required to have had a <br /> complete chemical/physical examination to comply with the medical monitoring program. <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.