Laserfiche WebLink
SWRCB,January 2002 • • Page q of (o <br /> 6. PII'ING SUMP TESTING <br /> Test Method Developed By: C Sump Manufacturer C Industry Standard Rfrofessional Engineer <br /> C Other(Specify) <br /> Test Method Used: C Pressure C Vacuum PHydrostatic <br /> C Other(Specie) <br /> Test Equipment Used: 0L.3 Equipment Resolution:&,66a�t <br /> Sump# Sump# sump#Aua&2K Sump# <br /> Sump Diameter: go << C)11 41 2 1, <br /> Sump Depth: a 0 It / 11 4/ 17 1( <br /> Sump Material: F= F669-04 <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: <br /> ti l t7 1 <br /> Height from Tank Top to Lowest 8 rl Z n it <br /> Electrical Penetration <br /> Condition of sump prior to testing: 6crmb 4010-D <br /> Portion of Sump Tested' / 1/ /4/1 t / 2_11 <br /> Does turbine shut down when <br /> sump sensor detects liquid(both 9'i'es []No CNA Wfes C No CNA B fes C No C NA C Yes C No C NA <br /> product and water)? <br /> Turbine shutdown response time *-0kaorr0WZ V4XbAW tQepT T Vt t f atrr 15KC- <br /> Is system programmed for fail-safe <br /> shutdown? &,Yes C No CNA des C No CNA ®Yes C No C NA C C C <br /> Yes No NA <br /> Was fail-safe verified to be <br /> operational?* P-Yes C No CNA SKYes []No CNA Rl es C No CNA C Yes []No CNA <br /> Wait time between applying <br /> pressure/vacuum/water and starting sr� �� <br /> test: �3Ln& * 30A1"1Lt <br /> Test Start Time: /0 ; q7S <br /> Initial Reading(Ri): 7 10 ML q/C)ML- ML, <br /> Test End Time: 12; Z U /,s; 33 <br /> Final Reading(RF): 0 0AL 9 70 nu, 760 mi— <br /> Test <br /> Test Duration: 16, ttnU /7, 1 ,qrri <br /> Change in Reading(RF-Rt): 3 w.t 4 0 ml_ y 0 m L <br /> Pass/Fail Threshold or Criteria: G,(k7 Za < .00211 < .0 0 2 1, <br /> Test Result: 6YBass 0 Fail VPass ❑Fail "ass C Fail ❑ Pass C Fail <br /> Was sensor removed for testing? VYes C No C NA V3 'es C No CNA 91'es C No CNA C Yes C No CNA <br /> Was sensor properly replaced and Byes ❑No L1 NA fi}1 es 11 No L1 NA B'Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments— (include information on repairs made prior to testing and recommended follow-up orfailed tests) <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entre sump must be tested. (See SWRCB LG-160) <br />