My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_2005 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 3:06:28 PM
Creation date
11/8/2018 9:59:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2008
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\W\WEST\4040\PR0231963\COMPLIANCE INFO 2005 - 2008.PDF
QuestysFileName
COMPLIANCE INFO 2005 - 2008
QuestysRecordDate
8/2/2018 5:38:18 PM
QuestysRecordID
3952805
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V"ORLESS MANUFACTURING, INC. <br /> Com LD1-890 Leak Detector Test Record <br /> Custorr�r <br /> O <br /> Date LocationU - �� <br /> /2- -Q Product e7a <br /> M—fir Submersible Pump Identification <br /> Mom. <br /> »i <br /> Serial <br /> Number. <br /> Mianuba_ cam— Leak Detectorldentitication <br /> Desch n <br /> —= Diaplrragrrrtype Other Style Leak Detector <br /> ! 9 5 P, �tziston-type <br /> P� ✓ <br /> Leak Detector in Submersible Pump <br /> Test at Dispenser <br /> h' Operating Pump Pressure psi (purging Test System) <br /> 2. Gallons per hour rate_`3, <br /> � .(Leak Test(Phase 1) <br /> 3. Line pressure with pump shut off Z <br /> si (Leak Test Phase 1) <br /> 4. Bleedback Test with pump off <br /> ml (Bleed-back Test) <br /> 5. Step-through time to full flow 1Q2 <br /> econds(Step-through Time) <br /> 6. Leak detector sNctr b041AO) (Leak Test Phase 2) Yes <br /> No <br /> LF.ah{DETECTOR TEST <br /> ze. Pass=Leak detector stays in slow-flow during GPH test <br /> Fail=Leak defectors"through to allow full pump pressure during GPH test <br /> Pass__ <br /> Fail <br /> -Complete thermal expansion test before failing leak detector. <br /> Form 890C(May 9,2002) <br /> 2002 Vaporless Manufacturing,Inc.,Prescott Valley,AZ <br />
The URL can be used to link to this page
Your browser does not support the video tag.