Laserfiche WebLink
SWA,January 2002 + • Page 3—of <br /> S. SECONDARY PIPE TESTING <br /> Test Method Developed By. n Piping Manufacturer Andustry Standard n Professional Engineer <br /> G Other(Specify) <br /> Test Method Used: Vf1ressure 0 Vacuum 1-1 Hydrostatic <br /> C Other(Sped) <br /> Test Equipment Used: -SP,4rJ /S P5S Equipment Resolution: 2PSt <br /> Piping Run N KULD Piping Run p PIF Piping Run p 4)..Q Piping Run dl <br /> Piping Material: FXJek44,f55 Frza E4LEt <br /> Piping Manufacturer. A.D.S 4.D. <br /> Piping Diameter. 211 3 - <br /> Length of Piping Run: 105- S"F f 2 0 Fr- <br /> Product Stored: U N L w,� <br /> Method and location of ?-&SrBoot'e,5 '$LTBDYJ/E° OO caorw Oefrd -Wmp <br /> piping-run isolation: ltd L �- 4c, •a r.r, .'M +tE <br /> Wait time between applying <br /> pressure/vacuum/waterand jD,HirN !,� � Q/tt.lN <br /> starting test: <br /> Test Stan Time: <br /> Initial Reading(RJ: $ 's <br /> Test End Time: ; /(� r /(o <br /> Final Reading(RF): S S S S <br /> Test Duration: J Q ryt r7V 30 Mrw <br /> _ Change in Reading(R,RJ: B 3 S -- <br /> Pass/Fail Threshold or <br /> Criteria: a/ti17U SO t?Sr 3v.,xr>du 3.07 _?Orr7 fir/ <br /> Tett Remit: R'Pan 0 Fail Q Pass 0 Fall D Pam iYFail 0 Pass 0 Fall <br /> Comments—(include injormatton on repairs made prior to testing,and recommended follow-up for jailed tests) <br /> t:11nIT/l27UMEYt>T SOZftTSn�"'�S DSC fS KA r'"i1 fD➢e 3 O�S..C" 7Z:�T <br /> kCC-gmMc-n)h ge'1 *-twm 7Z5T1W(b N D SEZ&xJb <br />