My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_2005 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 3:06:28 PM
Creation date
11/8/2018 9:59:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2008
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\W\WEST\4040\PR0231963\COMPLIANCE INFO 2005 - 2008.PDF
QuestysFileName
COMPLIANCE INFO 2005 - 2008
QuestysRecordDate
8/2/2018 5:38:18 PM
QuestysRecordID
3952805
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, Dec 21 2007 11 : 49AM HP LASERJET FAX P. 6 <br /> F. In-Tank Gauging/SIR Equipment: VCheck this box if tank gauging is used only for inventory controL <br /> ❑ Check this box if no tank gauging or SIR equipment is installed <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Co let- the following checklist: <br /> NNo Has all input wiring been inspected for proper and termination,including testing for ground faults? <br /> * ganging probes visually for damage and residue buildup?* Was=-curacy of system product 1 tested?Wm water 1 readings tested?Wereall probes re' 1y?Were all items on t manufacturer's maintenance checklist completed? <br /> *In the Section 11,below,descrlb wand when these dediciencica were or wID be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Co lete the folio ' ebeckrut: <br /> Yes ❑ N/A❑ For equipment start-up or amoral agnipmem certification, was a leak simulated to verify LLDperformance? <br /> (Check al!that apply) Simulated leak rate: �3 g p.b.; L]0.1 g.p.h• 130.2 g p.L <br /> Yes 13 No* Were all LLDs con meed operational and accurate within regulatory nx mrements7 <br /> Yea ❑ No* Was the testing apparatus properly caitbratad7 <br /> ❑ Yes ❑ NO For me-hani-al LLDs,does the LLD restrict product flow if it detects a leaW <br /> DeNlA <br /> Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> �'Yea ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑ NI or disconnected? <br /> Qlws ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system m,j ,ctions <br /> ❑ N/A or fails a test? <br /> Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> Yes ❑ Not Were an items on the equipment manufacturer's maintenance checklist completed? <br /> 1n the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 03101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.