Laserfiche WebLink
01/24/2005 15:17 2099421460 PG&E MKTG STKN PAGE 04 <br /> 401140ring System Certification • • <br /> Site Address: <br /> pate t+I`Testing/Servicing:T/ <br /> F. Ing-Tank Gauging/SIR)L,quiputent: R Check this box if rank <br /> gauging is used only£or inventory ooatroL <br /> ❑ Check this box'P no tank gauging or SIR equipment is installed <br /> This section most be cowpleted if is-tank gauging equiprneUt is Used to perFoxni leak detection monitoring <br /> Com ete the fopowiu checklist: <br /> yes 4 Not Has all i put wiring been inspect edforproper entry and terminatio tncludin les " for <br /> l ,Yes 0 No* Were all tank gauging probes visuallyinspectedfor u ground faults? <br /> q 'Yes a No* Was Accu � � d�ageatidresidvebaildup? <br /> racy of system Product level xmdi tested? <br /> ❑ Yes U No* Was accuracy cf&ystem water level readtn11 <br /> �Yes O Na* $'msted7 <br /> Were all pmbes reinsta$ed properly? <br /> $I yes ❑ Not Were all items on the cqutpxuent xoamfachuer's maintenance checklist compl <br /> " Xn the Section Y3�below,describe how and whey these deficiencies Frere or will he coxr Yed7 <br /> edecL <br /> G. Line Leak Detectors(LLD): O'Check this box if LLDs are not installed <br /> Cam etethefollowi checklist: <br /> yes ❑ No* Par equipment start-up or annual <br /> ❑ N/A (Check alT that i equipmentcertification, was a leak simulated to vexrfy;[J D performance? <br /> aPPY) Simulated leak xate:�3 gp.h; q O l gp,h , 0.2 h <br /> gR <br /> Yes Cl Not Were all LLDs;cezlatxned opesaponalaccw-ats within re . <br /> lrf Yes Ll Na* Was the tnsling apparatus properly calibxated7 �''lazOx➢�Rttisemeims? <br /> Yes Cl No* For mecban-7.T Ds,dans the L7:D restrict <br /> U NIA product flow if it detects a leaf <br /> yes Gt No* For electiomQ LT,bs,does the turbine automatically shut off if T LD detects a Wk? <br /> Yes q Ne Par electronic LLDs,does the turbine automatically shut off if an <br /> W N/A. or disconnected? y Poon of the monitoring system is disabled <br /> P,Yes -Cl No* For a wtrumeLLDs does the turbine auto <br /> N/A malfwtctians or fails a testi? maritally shut off if any portion ofthe monitoring system <br /> Yes d No* For electronic have au accessible vjxdn <br /> V g cotutcctions been visually inspected? <br /> 3 Yes © No* Were au items on the equipment manufactureYs <br /> *'In the Section maintenance checklist completed?$below,describe how and whey these deticlencies were or will be corrected. <br /> M Coxttments: <br /> Page 3 of 3 <br /> 05foo <br />