Laserfiche WebLink
AUG-26-2008 08 :40 AM GETTLER—RYAN INC. 925 551 4770 P. 06 <br /> Secondary Containment Testing Report Form- Page 5 of 5 <br /> I as Fail'11 lineshold or Criterul, <br /> Fail �ail <br /> Test Result: Pass; Fall <br /> Was 1eak d tectIon st:rLqpr ❑ _j Yes: El N,% Ytt;;Cl No. <br /> properly replaced and verifiedas Yes� No: Ycs: No; <br /> NiA I NO Rollmal I o Rom.,�.Nh N A(Not Reim <br /> functional aller testing'! N'A <br /> LC <br /> 1. Testing of Spill Buckets N/A(Nn spill buckets installed) <br /> Fl Spill bucket(s)aur tested <br /> fest Method Developed By: C1 Bucket ManLjtuC(LjrQI% I Industry Suindird: [7 <br /> 1 <br /> ] PI.. [D ottler 61'evif.W: <br /> e <br /> -Fe,47�let kid Uscd: L] Pressure: [I Vacuum; F IV is-k�sujjjv: Ej Oth r fSpo it)J <br /> 'fust Equipment Used: <br /> Butketik: I Ilticket.O.;. Bucket#: Bucket q: <br /> Bucket Diameter: ...... <br /> Hucket Dcpth: <br /> Wait time between applying <br /> prcmure-t acuum"Watcr and <br /> ... ......... <br /> Test Start l'one: <br /> initial Resiling(Bili <br /> 'l est End Time: <br /> Final Reading(RI 1: .. .... _ . .... .. ..........—'--- . ---- --'---' <br /> ('ban#7ein Reading(11, ftj): ....... <br /> I'am Fail'Threshold or Criteria: <br /> Fall Puss-, L1 1111il <br /> Pass; gltail <br /> 10 1,,1111 ❑ Piuoi; <br /> Test ........ <br /> .1. Additional InfOl-InatiOR <br /> Were any repairs made to secondary Qvittaijullent systems prior to lestillp? E] Ycs(describe III 'Colunictits"):EI N-I <br /> Were any secondary etintainnicat systems unable to be lemed., [I ycs(Liml-il'o In ( Imurents"1: [1 No <br /> Is any t'tillim-up action reconurcudekl? E] Y,:A jdeserffie to Volinvie"Is"11 N, <br /> Was any cleaning orsewndary containment NNmlems done! 0 Yen ioeseribe 0f%\LI-4Iv%valcr in "Coninivilts" No <br /> lfhYdroslativ Ws'ling was peri"Irmad.dewribi., In "Colo mvitts" N\hat ith the wines,filar Q(.111ploion 111,1c"ling. <br /> ('oraments! Water was left at site W'their liquid hazardous 55 gill.barrek, <br /> L N4141 j <br />