My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_2009 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:59:06 PM
Creation date
11/8/2018 9:59:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2015
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\W\WEST\4040\PR0231963\COMPLIANCE INFO 2009 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 2009 - 2015
QuestysRecordDate
8/2/2018 4:41:39 PM
QuestysRecordID
3952362
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7149782615 026 a.m. 10-20-2014 7/14 <br /> RECEIVED <br /> F.In-Tank Ganging I SHR Equipment: <br /> L✓ Check this box if tank gauging is used only forinventWPngoo 2014 <br /> r Check this box if no tank gauging or SIR equipment is installed <br /> This section mustbe completed if in-tank gauging equipment is used to perforin leak detection monitotgVIRONMENTAL HEALTH <br /> DEPARTMENT <br /> Complete the following checklist <br /> r Yes r No* Hes all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> f Yes r No* Here all tank gauging probes visually inspected fordamage and residue buildup? <br /> r Yes r No* Was uccumcy of system product level readings tested? <br /> F Yes r No* Was accuracy of system water level readings tested? <br /> F Yes r No* Were all probes reinstalled properly? <br /> r Yes r No" Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In die$eedan H,blow,describe how andwhen time deridencies were or will be rnmected. <br /> G.Line Leak Detectors(LLD): r Check this box if LLDs are not installed. <br /> Complete the following checklist <br /> F Yes r No* Forequipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(Check <br /> F_ N/A all that apply)Simulated leakrate: r 3gph.: r 0.1 gph: r 029.ph. <br /> r Yes r No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ro Yes r No* Wes the testing apparatus properly calibrated? <br /> r Yes r No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> F NIA <br /> rYes rNo* For electrunic LLDs,don the turbine automatically shut off ifthe LLD detects aleak? <br /> F N/A _ <br /> F Yes r No* Forelcetronic LLDs,does the turbine automatically shut off if my portion of the monitoring system is disabled or <br /> F N/A disconnected? <br /> F Yes r No* For electronic LLDs,does the turbine automatically shut off ifany portion of the monitoring system malfunctions or <br /> F N/A fails a test? <br /> r Yes r No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> FN/A <br /> r Yes r No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In theSedbn H,bebw,describe haw and whars these delidendes were or will becorreded. <br /> H. Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.