My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_2009 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:59:06 PM
Creation date
11/8/2018 9:59:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2015
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\W\WEST\4040\PR0231963\COMPLIANCE INFO 2009 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 2009 - 2015
QuestysRecordDate
8/2/2018 4:41:39 PM
QuestysRecordID
3952362
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> Test Boots <br /> FlexWorks Test Boots are used to MAY 0 G 2015 <br /> isolate and air-test the interstitial t6E RONMENTALHEALTH <br /> space between the primary and ERMIT/SERVICES <br /> secondary pipe.One test boot is <br /> required for each pipe end. <br /> Models TBA-3015, Models TBA-0075, <br /> TBA-3020,TBA-4015 and TBA-4020 TBA-0100,TBA-0150,TBA-0200 and TBA-0300 <br /> R <br /> Test Jumper for Air Stems <br /> _ (TJ-200A) <br /> T_ <br /> Test Gauge Assembly(TGA-15) <br /> 0 <br /> Test Line Termination Kit for Air Stems <br /> (TLT-36A) <br /> TCT-2509 <br /> TTT-2536 <br /> Ordering Specifications - Test Boot & Testing Equipment <br /> Model Of Application Weight <br /> lbs. kg <br /> TBA-0075 'A"Test Boot with Air Stem 0.20 0.09 <br /> TBA-0100 1"Test Boot with Air Stem 0.20 0.09 <br /> TBA-0150 1.5"Test Boot with Air Stem 0.35 0.16 <br /> TBA-0200 2"Test Boot with Air Stem 0.40 0.18 <br /> TBA-0300 3"Test Boat with Air Stem 0.70 0.32 <br /> TBA-3015 3"to 1.5"Test Boot with Air Stem 0.35 0.16 <br /> TBA-3020 3"to 2"FRP Test Boat with Air Stem 0.40 1.18 <br /> TBA-4015 4"to 1.5"Test Boot with Air Stem 0.75 0.34 <br /> TBA-4020 4"to 2"Test Boot with Air Stem 0.75 0.34 <br /> TBA-4030 4"to 3" FRP Test Boot with Air Stem 0.70 0.32 <br /> TJ-200A Test Jumper for Air Stems <br /> TLT-36A Test Line Termination Kit for Air Stems <br /> TGA-15 Test Gauge Assembly <br /> TCT-2509 Test Jumper for Double-Wall Coupling(DPC and SBC Series) <br /> TTT-2536 Test Tube Termination Kit for Double-Wall Coupling(DPC and SBC Series) <br /> 38 O P W 9393 Princeton-Glendale Road r Hamilton,Ohio USA 45011 Phone:(800)422-2525 a Fax:(800)421.3297 <br />
The URL can be used to link to this page
Your browser does not support the video tag.