My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_2009 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:59:06 PM
Creation date
11/8/2018 9:59:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2015
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\W\WEST\4040\PR0231963\COMPLIANCE INFO 2009 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 2009 - 2015
QuestysRecordDate
8/2/2018 4:41:39 PM
QuestysRecordID
3952362
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED � <br /> MAY 0 6 2015 <br /> 1.0 INTRODUCTION <br /> ENVIRONMENTAL HEALTH <br /> ° 9 n Fr� II"L$ <br /> The purpose of this Health and Safety Plan SSPv) is o define on-site health and safety roles, health <br /> and safety procedures, and discuss chemical and physical hazards, and electrical safety issues which <br /> may be encountered at the project. <br /> The elements of the HASP include procedures for personnel protection equipment safety, medical <br /> surveillance, air quality monitoring, and general safe work practices. This plan also details the proper <br /> emergency procedures, including emergency response and first-aid capabilities. Compliance with this <br /> HASP is required of all workers and third parties who enter the sites while the above work is in <br /> progress. <br /> Tait clients may suggest or require adherence to their company HASP. Tait employees shall adhere <br /> to the more stringent procedures in either case or the required procedures by Cal/OSHA or other <br /> Federal mandated safety orders. <br /> 1.1 SCOPE OF WORK <br /> The scope of work for this project includes: Vent Box Installation <br /> 2.0 ENVIRONMENTAL PROTECTION PLAN <br /> It is important to protect the surrounding environment as it exists around the work area involved. All <br /> trees, plants, and shrubs close to the work area will be barricaded if necessary to reduce the risk of <br /> damage from construction debris and equipment. All efforts will be made to insure protection of <br /> natural resources within the boundaries of the project and within the work area. All demolition and <br /> excavation will be limited to the enclosed work area. <br /> Dust control measures, in the form of water spray, will be used to prevent dust migration from the <br /> excavation site. This is a generally accepted procedure by all Governing Agencies. <br /> Generated hazardous waste will be handled and disposed of in Compliance with the following; 40 CFR <br /> 260, 40 CFR 261, 40 CFR 262, 40 CFR 263, CFR 1910, Title 22 Division 4, Title 23, Cal OSHA, and Cal <br /> Haz-Mat Enforcement and Liability. <br /> 3.0 HEALTH AND SAFETY PERSONNEL <br /> 3.1 INTRODUCTION <br /> The following sections briefly describe the Health and Safety Personnel, and general <br /> responsibilities, which will be employed during the project. <br /> 3.2 HEALTH AND SAFETY MANAGER (HSM) <br /> 11/07/2005 revision 5 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.