My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_2009 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:59:06 PM
Creation date
11/8/2018 9:59:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2015
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\W\WEST\4040\PR0231963\COMPLIANCE INFO 2009 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 2009 - 2015
QuestysRecordDate
8/2/2018 4:41:39 PM
QuestysRecordID
3952362
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
71497?2615 • 0915 a.m. 10-20-2014 4114 <br /> REGEIVtD <br /> TAIT OCT 2 0 2014 <br /> 111 ENVIRONMENTAL HEALTH <br /> DEPARTMENT <br /> LEAK DETECTOR TESTING i <br /> =andas and Electric Company est Date: 9/18/2014EST LANE echnician : Victor Guerrero <br /> TONia 8017001-UTICC#: t <br /> Test Information s <br /> rLei*k <br /> Unleaded Diesel <br /> Gilbarco V-R Gilbarco V-R <br /> I <br /> Red Jacket Red Jacket j <br /> 1 <br /> ector(Yea/No) No Noi r 119295 100110491 ! <br /> i <br /> i Electronic LD(Y es/No) Yes Yes 3 <br /> j Calibrated Test Leak Rate: (189 Yes Yes j <br /> mil/min ® 10 PSI)(Yes/No) <br /> Check Valve Holding PSI 27 psi 31 psi j <br /> Resiliency (Bleed Back MIL) 55 MIL 35 MIL I <br /> i <br /> Slow Flow Metering PSI/(N/A) NA NA <br /> Turbine Shut Down Electronic LD Yes Yes 9 <br /> (Yes/No/NA) <br /> Slow Flaw At Novle NA NA <br /> (Yes/NO/NA) i <br /> Opening Time(Seconds) 3 Sec. 5 Sec. <br /> i <br /> Pass/Fail Pass Pass— <br /> This letter certifies that the annual leak detector tests were performed at the above referenced facility according to the <br /> l <br /> !i equipment manufacturers procedures and limitations and theresults as listed are to my knowledgetrue and correct The j <br /> leak detector test pass/fail is determined using a low Bow threshold trip rate of 3 gph at 10 PSI. <br /> i <br /> i <br /> (/ <br /> Technician Signature: `�� Date : 9/1812014 <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.