My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_2016 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:56:03 PM
Creation date
11/8/2018 9:59:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2017
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\W\WEST\4040\PR0231963\COMPLIANCE INFO 2016 - 2017.PDF
QuestysFileName
COMPLIANCE INFO 2016 - 2017
QuestysRecordDate
7/23/2018 8:37:33 PM
QuestysRecordID
3946151
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSTALLATION MATERIALS CHECKLIST <br /> ❑ Tools & Equipment ❑ Offsets, elbows, nipples, unions, Etc.. <br /> ❑ Concrete Anchor Bolts * ❑ Plastic caps (sow plugs) for nuts / bolts <br /> �c S. Bravo Systems, Inc. does not include Concrete Anchor Bolts with its Conversion Frames. <br /> PRE-INSTALLATION CHECKLIST <br /> ❑ Ensure that you have all your permits in order, including your Bravo Certification Card. <br /> ❑ Conversion Frame is free of damage? <br /> ❑ Physically check the Dispenser, Sump and Conversion Frame drawings before installation? <br /> ❑ NO modification to the Conv-Frame is necessary? If so, Call 323-888-4133 immediately. <br /> INSTALLATION CHECKLIST <br /> ❑ Dispenser was carefully removed and any spills contained? <br /> ❑ Drawings for all components are on-site and have been reviewed for any problems? <br /> ❑ Conversion Frame is securely bolted to the existing UDC Sump with minimum 1/2" bolts? <br /> ❑ If OPP or a Non-Bravo Systems UDC is existing, were a minimum of 4 anchor bolts <br /> securely installed directly to the concrete? <br /> ❑ All electrical conduits are adjusted correctly to mate with the new dispenser? <br /> ❑ All product inlets are pre-plumbed with approved offsets, elbows, pipe, etc..? <br /> ❑ Conversion Frame was inspected for dents or damage? <br /> ❑ Dispenser was carefully lined up and securely bolted to the Conversion Frame? <br /> 4 ii-Conversion Frame 3-25-08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.