Laserfiche WebLink
SWRCB,January 2002 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer El Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: 0 Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Sped) <br /> Test Equipment Used: 4" Dial Gauge Equipment Resolution: .1 <br /> Oil secondary <br /> Piping Material: Fiberglass <br /> Piping Manufacturer: Ameron <br /> Piping Diameter: 3" <br /> Length of Piping Run: Approx. 20' HP <br /> Product Stored: Waste Oil ""` '' <br /> Method and location of Test Boot <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 min. ENVIRONMENTAL HEAL <br /> TH <br /> starting test: <br /> Test Start Time: 9:01 am ENT <br /> Initial Reading(Ri): 5 psi <br /> Test End Time: 10:01 am <br /> Final Reading(RF): 5 psi <br /> Test Duration: 1 hour <br /> Change in Reading(RF-RI): 0 <br /> Pass/Fail Threshold or 0 <br /> Criteria: <br /> Test Result: Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />