Laserfiche WebLink
RECEIVED <br /> D. Results of Testing/Servicing JUN 14 2017 <br /> Software Version Installed: 120.02 ENVIRONMENTAL HEALTH <br /> Complete the following checklist: DEPARTMENT <br /> ❑X Yes ❑No* Is the audible alarm operational? <br /> ❑X Yes ❑No* Is the visual alarm operational? <br /> Q Yes ❑No* Were all sensors visually inspected, functionally tested,and confirmed operational? <br /> ❑X Yes ❑No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment <br /> will not interfere with their <br /> proper operation? <br /> ❑ Yes ❑No* If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem) <br /> ❑X N/A operational? <br /> ❑ Yes ❑No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary <br /> ❑X N/A containment monitoring system detects a leak,fails to operate,or is electrically disconnected?Ifyes:which <br /> sensors initiate positive shut-down?(Check all that apply) <br /> ❑Sump/Trench Sensors; ❑DispenserContainmentSensors. Did you confirm positive shut-down <br /> due to leaks and sensor failure/disconnection? <br /> ❑Yes; ❑No. <br /> ❑ Yes ❑No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no <br /> mechanical overfill prevention valve is installed),is the ovetfill warning alarm visible and audible at the <br /> 0 N/A tank fill point(s)and operating properly?If so, at what percent of tank capacity does the alarm trigger? <br /> =Yes- 0 No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment <br /> replaced and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑Yes* ❑X No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that <br /> apply) ❑Product; ❑Water.If yes,describe causes in Section E,below. <br /> ❑X Yes ❑No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> ❑X Yes ❑No* Is all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were orwill be corrected. <br /> E. Comments: <br /> Other sensors from page one: <br /> L16: Waste Oil drain pan sensor :794380-208 Certified <br />