Laserfiche WebLink
Ji <br /> y i A <br /> SEF 2 8 WRCB,January 2006 <br /> Spill Bucket Testing Report Form <br /> !—"tom <br /> This form is intended for use by contractors performing annual testing of'UST spill c4atlinment structures. The compleied form and <br /> printouts from tests(f applicable),should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1. FACILITY INFORMATION Facility ID: PGE095 <br /> Facility Name: Pacific Gas and Electric Company I Date of Testing: 9-13-2017 <br /> Facility Address: 4040 West Ln. Stockton CA 95204 <br /> Facility Contact: Alex Steele Phone: 209-736-6426 <br /> Date Local Agency Was Notified of Testing: 9/6/17 <br /> Name of Local Agency Inspector(f present during testing): Cesar Ruvalcaba <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name: TAIT Environmental Services <br /> Technician Conducting Test: Garrett Warren <br /> Credentials': ❑x CSLB Contractor ❑x ICC Service Tech. ❑SWRCB Tank Tester ❑Other(Specify) <br /> License Number(s): A B ASB C-10 HAZ,588098 8185019 <br /> 3. SPILL BUCKET TESTING INFORMATION <br /> Test Method Used: ❑x Hydrostatic []Vacuum ❑Other <br /> Test Equipment Used: Incon TS-STS Equipment Resolution: .0006 <br /> Identify Spill Bucket(By Tank I Unleaded 2 Diesel 3 Waste Oil 4 <br /> Number, Stored Product, etc.) <br /> ❑x Direct Bury ❑x Direct Bury ❑x Direct Bury ❑Direct Bury <br /> Bucket Installation Type: ❑Contained in Sump ❑Contained in Sump []Contained in Sump ❑Contained in Sump <br /> [I On Top of AST ❑On Top of AST ❑On To of AST []On Top of AST <br /> Bucket Diameter: <br /> Bucket Depth: 14" 14" 13.50" <br /> Wait time between applying 15 min 15 min 15 min <br /> vacuum/water and start of test: <br /> Test Start Time(TI): 9:18am/9:34am 9:18am/9:34am 12:07pm/12:23pm <br /> Initial Reading(Rj): 6.4612/6.4611 5.4976/5.4976 6.7841 /6.7840 <br /> Test End Time(TF): 9:33am/9:49am 9:33am/9:49am 12:22pm/12:38pm <br /> Final Reading(RF): 6.4611 /6.4608 5.4976/5.4972 6.7840/6.7839 <br /> Test Duration(TF—TI): 15 min/15 min 15 min/15 min 15 min/15 min <br /> F <br /> hange in Reading(RF-RI): .0001 /.0003 0/.0004 .0001 /.0001 <br /> ass/Fail Threshold or .002 .002 .002 <br /> riteria: <br /> Test Result: ❑x Pass ❑Fail I ❑x Pass ❑Fail ❑x Pass ❑Fail ❑ Pass []Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Test water was left on site. <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> I hereby certify that all the information contained in this report is true,accurate,and in full compliance with legal requirements. <br /> Technician's Signature: 66VX&ZUavi" Date: 9-13-2017 <br /> State laws and regulations do not currently require testing to be performed by a qualified contractor.However,local requirements <br /> may be more stringent. <br />